High-rise floor foundation sister hole blasting method for building and construction on connecting hillstone

A sister, high-rise technology, applied in infrastructure engineering, construction, sheet pile walls, etc., can solve the problems of wasting labor, wasting economy, affecting the progress of the project, etc., to achieve the effect of fast construction, labor saving, and low cost

Inactive Publication Date: 2015-01-07
李尚喜
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Now as long as a high-rise building is built, there must be an underground sub-floor, and foundation excavation and piling are still being carried out below the underground layer, which wastes money and manpower, and affects the progress of the project.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-rise floor foundation sister hole blasting method for building and construction on connecting hillstone
  • High-rise floor foundation sister hole blasting method for building and construction on connecting hillstone
  • High-rise floor foundation sister hole blasting method for building and construction on connecting hillstone

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0010] Referring to the construction and construction of the high-rise building foundation sister hole blasting method on the Lianshan stone of the present invention, the general schematic diagram of the sister hole project, see figure 1 , figure 2 , image 3 .shown in figure 1 In the 1 Lianshan stone, high-rise buildings are built, and a pair of stones are built on the stone. figure 1 2 in and figure 1 Among the 3 sister holes, in a pair of sister holes, one hole is filled with concrete first, and the prestressed steel bars are inserted immediately. Breaking is a backlog of stones, let the steel bars bear the force, pour the blasted hole into concrete again, and pour the blasted hole with concrete, and after it is hardened, you can construct more than plus or minus zero. The sister holes must be close to each other. Conducive to blasting backlog grouting.

[0011] see figure 2 The construction of the foundation sister hole blasting method of the high-rise building on ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a high-rise floor foundation sister hole blasting method for building and construction on connecting hillstone. A pre-stressed steel bar, sister holes and expansive concrete of the two sister holes are included. The method is characterized in that a high-rise floor is built on the hillstone, the two sister holes are drilled in the hillstone, the pre-stressed steel bar is inserted in one sister hole immediately, explosive is placed in the other sister hole, blasting is achieved fast, the hole with the steel bar is damaged, the steel bar is stressed by accumulating stone in the blasting process, the concrete is pressed and injected into the exploded hole, the concrete is pressed and poured in the blasted hole, after hard solidification, construction above + / -0.000 can be carried out, the two sister holes must be close, and the optimal effect of blasting, accumulating and grouting can be achieved. According to the method, construction is convenient, project quality is high, construction is fast, and manufacturing cost is low.

Description

Technical field: [0001] The construction and construction of the foundation sister hole blasting method of the high-rise building on the Lianshan stone of the present invention relates to the construction of the high-rise building, especially the foundation construction on the Lianshan stone. technical background: [0002] In the foundation construction of high-rise buildings in the technology in the present technology, it is generally trough type construction, or pile type. Now as long as a high-rise building is built, there must be an underground sub-floor, and foundation trenching and piling are still being carried out below the underground layer, which wastes money and manpower, and affects the progress of the project. Invention content: [0003] The construction and construction of the foundation sister-hole blasting method of the high-rise building on the Lianshan Stone in the present invention just overcomes the above-mentioned shortcomings, and the blasting constru...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/36E02D5/58
CPCE02D5/36E02D5/58E02D2250/0023E02D2250/0046
Inventor 李尚喜
Owner 李尚喜
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More