Smelting furnace with jacking device
A technology of jacking device and melting furnace, which is applied in the direction of furnaces, crucible furnaces, furnace types, etc., can solve the problems of affecting the normal operation of melting furnaces, inconvenient staff, waste, etc., to avoid heat transmission, work conveniently, and facilitate observation Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0016] Such as figure 1 with figure 2 Shown: a smelting furnace with a jacking device, which includes a furnace body 1, a moving wheel 2 arranged at the bottom of the furnace body 1, and a furnace cover 3 arranged on the upper part of the furnace body 1, and the furnace cover 3 is provided with A circular groove 4, the depth of the circular groove 4 extends to the middle and upper part of the furnace body 4, an induction coil 5 is arranged on the outer periphery of the circular groove 4, and a crucible is placed in the circular groove 4 6. A cement partition 7 is installed at the bottom of the crucible 6, the cross-sectional area of the cement partition 7 is smaller than the cross-sectional area of the circular groove 4, and the bottom of the cement partition 7 is connected with a jacking platform 8, The bottom of the jacking platform 8 is connected with a lifting rod, and the lifting rod includes two parts, which are respectively a screw rod 9 and a sleeve rod 10 that i...
Embodiment 2
[0019] Such as figure 1 with figure 2 Shown: a smelting furnace with a jacking device, which includes a furnace body 1, a moving wheel 2 arranged at the bottom of the furnace body 1, and a furnace cover 3 arranged on the upper part of the furnace body 1, and the furnace cover 3 is provided with A circular groove 4, the depth of the circular groove 4 extends to the middle and upper part of the furnace body 4, an induction coil 5 is arranged on the outer periphery of the circular groove 4, and a crucible is placed in the circular groove 4 6. A cement partition 7 is installed at the bottom of the crucible 6, the cross-sectional area of the cement partition 7 is smaller than the cross-sectional area of the circular groove 4, and the bottom of the cement partition 7 is connected with a jacking platform 8, The bottom of the jacking platform 8 is connected with a lifting rod, and the lifting rod includes two parts, which are respectively a screw rod 9 and a sleeve rod 10 that i...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| depth | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 