Automatic power supply switching control execution method for failures of regional power grid main equipment

A technology of regional power grid and execution method, applied in the direction of electrical components, circuit devices, AC network circuits, etc., can solve the problems of increasing the risk of remote control safety, long time required, and short execution time, so as to improve the efficiency of fault handling and ensure Safe operation and the effect of ensuring safety
CN104348153AActive Publication Date: 2015-02-11STATE GRID CORP OF CHINA +2

Patent Information

Authority / Receiving Office
CN Β· China
Patent Type
Applications(China)
Current Assignee / Owner
STATE GRID CORP OF CHINA
Publication Date
2015-02-11
Patent Text Reader

Abstract

The invention relates to a power grid power supply switching control execution method for failures of regional power grid equipment, in particular to an automatic power supply switching control execution method for the failures of regional power grid main equipment. An automatic power supply switching policy is obtained on the basis of a progressive main grid reconstruction technology and a power supply switching recovery path and has the characteristics of logicalization, methodization and effectiveness, and then a regional main grid switch is remotely controlled in an in-turn composite series-parallel remote control way which contains feedback unlocking logics, so that the overload of the main equipment is quickly eliminated or limited, the execution efficiency is improved, the execution time limit and the safety of power grid operation are guaranteed, the safety operation of the power grid main equipment is guaranteed, and the aims of assisting scheduling and monitoring staff to analyze and judge the failures of a power grid and improving the treatment efficiency of the failures are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a power grid transfer control execution method when regional power grid equipment fails, in particular to a regional power grid main equipment failure automatic power supply control execution method. Background technique

[0002] The failure of the main equipment (220kV main transformer or line) of the regional power grid caused the overload of the equipment, which needs to be quickly eliminated or limited. According to the past experience of the dispatching and monitoring personnel, the two methods to deal with this failure are nothing more than switching the power supply or limiting the power supply. . In the case of major power grid accidents, it is necessary to quickly restore the power outage load or switch some loads to limit the overload of the main equipment. At present, the usual way is that the dispatcher calls the operation station or the monitoring personnel to operate remotely, and the speed is slow. Untimely load...