A prefabricated direct burial and spanning tee technology, which is applied in the direction of pipes/pipe joints/fittings, heat preservation, and protection of pipes through heat insulation, etc., can solve problems such as no intelligent method, increased energy consumption, and energy leakage, so as to avoid energy leakage , high labor efficiency and low cost

Inactive Publication Date: 2017-10-13
HARBIN LOGSTOR ENERGY SAVING TECH
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] There is no intelligent method for the prefabricated direct-buried thermal insulation pipes currently used in the heating and cooling fields in China. In the middle, there is no intelligent method, resulting in the failure of the pipeline to detect and eliminate the danger in time, resulting in a large amount of energy leakage, increased energy consumption, and increased pollution emissions

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • The fixing method of the alarm line of the intelligent prefabricated direct-buried thermal insulation pipe steel pipe double-pipe spanning the tee
  • The fixing method of the alarm line of the intelligent prefabricated direct-buried thermal insulation pipe steel pipe double-pipe spanning the tee
  • The fixing method of the alarm line of the intelligent prefabricated direct-buried thermal insulation pipe steel pipe double-pipe spanning the tee

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0021] An intelligent prefabricated direct-buried thermal insulation pipe double-pipe spanning tee, which consists of: a polyurethane insulation layer 1, the polyurethane insulation layer is installed with a working steel pipe fitting A5, a working steel pipe fitting B6, a spanning working steel pipe fitting A7, a spanning Working steel pipe fittings B8, bracket 3, the polyurethane insulation layer is connected with the outer protection pipe 2, and the bracket is connected with the alarm line 4.

Embodiment 2

[0023] According to the intelligent prefabricated direct-buried thermal insulation pipe double-pipe spanning tee described in Example 1, the outer protective pipe is a polyethylene layer.

[0024] Implement Lee 3:

[0025] According to the intelligent prefabricated direct-buried thermal insulation pipe double-pipe spanning tee described in embodiment 1 or 2, the working steel pipe fittings A and the working steel pipe fittings B are installed in the polyurethane insulation layer in parallel, and the spanning work Steel pipe fittings A and spanning working steel pipe fittings B are installed in parallel in the spanning polyurethane insulation layer.

Embodiment 4

[0027] According to the intelligent prefabricated direct-buried thermal insulation pipe double-pipe spanning tee described in embodiment 1 or 2 or 3, the support has concave holes and round holes for threading.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an intelligent prefabricated directly-buried insulating pipe steel pipe double-pipe crossing tee joint and a fixing method for alarm cables. At present, as no intelligent method is used for prefabricated directly-buried insulating pipes applied to the field of heat and cold supply or insulating pipe double-pipe crossing tee joints with steel pipes as working pipelines in China, breakage of the pipelines can not be found in time, dangerous cases can not be eliminated in time, a great deal of energy leaks, and energy consumption and pollution emission are increased. The intelligent prefabricated directly-buried insulating pipe steel pipe double-pipe crossing tee joint comprises a polyurethane insulating layer (1), a working steel pipe fitting A (5), a working steel pipe fitting B (6), a crossing working steel pipe fitting A (7), a crossing working steel pipe fitting B (8) and supports (3) are installed in the polyurethane insulating layer, the polyurethane insulating layer is connected with an outer protective pipe (2), and the supports are connected with the alarm cables (4). The fixing method is used for installing the pipeline alarm cables.

Description

Technical field: [0001] The invention relates to an intelligent prefabricated direct-buried thermal insulation steel pipe double-pipe fixing method across a three-way alarm line, which is applied to the energy transmission pipeline used in the field of heating and cooling—the intelligent prefabricated direct-buried thermal insulation steel pipe in the prefabricated direct-buried thermal insulation pipe The installation and fixing method of the alarm line in the double-pipe crossing tee fitting. Background technique: [0002] There is no intelligent method for the prefabricated direct-buried thermal insulation pipes currently used in the heating and cooling fields in China, and there is no intelligent method for the double-pipe spanning tee fittings of the thermal insulation pipe with steel pipes as the working pipeline, resulting in the failure of the pipeline to be detected and repaired in time. Excluding dangerous situations will cause a large amount of energy leakage, inc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): F16L3/237F16L59/15
CPCF16L3/237F16L59/15
Inventor 张居山赖贞澄王辉
Owner HARBIN LOGSTOR ENERGY SAVING TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products