Unirrigated vegetation planting method by Haloxylonammodendron for heavy clay lands of arid area
A technology for arid areas and clay soils, which is applied in the fields of land preparation, afforestation, forestry, etc., and can solve problems such as high maintenance costs, good water retention, and difficult vegetation restoration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] In 2012, a test area (N45) was set up in the southern heavy clay area of Karamay Petrochemical Industrial Park o 19'28''E85 o 03′07′′), the test area chose the engineering trench section formed by bulldozers bulldozing from both sides of the road when constructing the road foundation. The engineering trench is perpendicular to the road. Planting Haloxylon in the last ten days:
[0032] Terrain arrangement: select the 5 m wide engineering trench terrain formed during the construction of the highway subgrade, and organize it into a water collection tank in the engineering trench section. The slope 1 of the edge of the ridge 5 is 40°, the length of the water collection tank is 25m, and the planting hole is excavated at the bottom 2 of the groove. The distance between adjacent planting rows at the edge of the tank is 3m. At the bottom of the tank 2 vertical and parallel to the direction of the water collection tank, a 20cm high water retaining soil ridge 4 is made ...
Embodiment 2
[0039] In 2014, in the heavy clay area in the southern part of Karamay Petrochemical Industrial Park, the construction area of the desert-free vegetation restoration project was 280 mu (N45 o 19'32'', E85 o 03′10′′), the survival rate reached 85%. In October 2013, the topography was adjusted, and the planting holes were dug to plant the substrate to replace the sand. In March 2014, Haloxylon was planted:
[0040] Terrain arrangement: arrange the terrain into a 5 m wide water collection tank, the bottom of the water collection tank is 3 m wide, the height of the trough water collection soil ridge 5 is 0.9m, the edge slope 1 of the trough water collection soil ridge 5 is 40°, the length of the water collection tank is 50m, Bottom 2 excavated planting holes with a diameter of 50cm and a depth of 70cm. The row spacing between plants was 2m×2-3m. At the bottom of the groove 2, perpendicular to the direction of the water collection tank, a 20cm high water retaining soil ridge 4 i...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com