Optimized scheduling method for production and assembly process of automobile air conditioner air outlet

An automotive air conditioner and optimal scheduling technology, which is applied in genetic rules, instruments, manufacturing computing systems, etc., can solve problems such as the NP-hard scheduling problem of the production assembly line of the air outlet of the automotive air conditioner

Active Publication Date: 2015-04-22
KUNMING UNIV OF SCI & TECH
View PDF3 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] Since the production and assembly line scheduling problem of the air outlet of the automobile air conditioner is an NP-hard problem, the traditional mathematical programming method cannot solve the problem. Therefore, the present invention designs an improved Adaptive Estimation of Distribution Algorithm (Improved Adaptive Estimation of Distribution Algorithm, The optimal scheduling method of IAEDA) can obtain an excellent solution to the scheduling problem of the production and assembly process of the air outlet of the automobile air conditioner in a short period of time.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Optimized scheduling method for production and assembly process of automobile air conditioner air outlet
  • Optimized scheduling method for production and assembly process of automobile air conditioner air outlet
  • Optimized scheduling method for production and assembly process of automobile air conditioner air outlet

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0082] Embodiment 1: as Figure 1-5 As shown, an optimal scheduling method for the production and assembly process of the air outlet of the automobile air conditioner, by determining the scheduling model and the optimization target of the production assembly process of the air outlet of the automobile air conditioner, and using the optimal scheduling method of the adaptive hybrid distribution estimation algorithm to optimize the optimization target Optimization; the scheduling model is established based on the processing time of the parts of the air outlet of the automobile air conditioner on each machine and the final assembly completion time, with the optimization goal of minimizing the average completion time:

[0083] C T ( π i p ) = max { max k = 1 ...

Embodiment 2

[0097] Embodiment 2: as Figure 1-5 As shown, an optimal scheduling method for the production and assembly process of the air outlet of the automobile air conditioner, by determining the scheduling model and the optimization target of the production assembly process of the air outlet of the automobile air conditioner, and using the optimal scheduling method of the adaptive hybrid distribution estimation algorithm to optimize the optimization target Optimization; the scheduling model is established based on the processing time of the parts of the air outlet of the automobile air conditioner on each machine and the final assembly completion time, with the optimization goal of minimizing the average completion time:

[0098] C T ( π i p ) = max { max k = 1 ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an optimized scheduling method for a production and assembly process of an automobile air conditioner air outlet, and belongs to the technical field of intelligent optimized scheduling in production workshops. An optimization objective and a scheduling model in the production and assembly process of the automobile air conditioner air outlet are determined, and the optimized scheduling method for an adaptive hybrid distribution estimation algorithm is used for optimizing the optimization objective, wherein the scheduling model is built according to the processing time of parts of the automobile air conditioner air outlet on each machine and the final assembly completion time, and the minimum average completion time is used as the optimization objective. The optimized scheduling method has the advantages that the expression of the production and assembly process of the automobile air conditioner air outlet is clear and accurate, and high-quality regions found through global searching are subjected to intensive local searching, so that better balance is achieved between the global searching and the local searching.

Description

technical field [0001] The invention relates to an optimal scheduling method for the production assembly process of an air outlet of an automobile air conditioner, and belongs to the technical field of intelligent optimal scheduling of a production workshop. Background technique [0002] At present, domestic auto interior parts production companies have entered the stage of low-profit development. How to produce higher-quality, lower-cost products is related to whether the company can continue to survive. Faced with such a crucial issue, all companies are considering various aspects. There are several countermeasures, and one of the good ways is to try to optimize the production assembly process and shorten the working hours to reduce costs and improve the price competitiveness of products. [0003] In modern manufacturing enterprises, the assembly workload accounts for 20%-70% of the entire product workload, with an average of 45%. Especially, the assembly time of automobil...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/04G06N3/12
CPCY02P90/30G06Q10/04G06N3/126G06Q50/04
Inventor 钱斌李子辉胡蓉
Owner KUNMING UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products