Check patentability & draft patents in minutes with Patsnap Eureka AI!

Horizontal well multi-cluster fracturing method and multi-cluster perforating and fracturing pipe column for implementing method

A technology of horizontal wells and showers, which is used in earth-moving drilling, wellbore/well components, and production fluids, etc., can solve the problems of unbreakable formation, unfavorable oil production operations, coiled tubing displacement and unsealing, etc., and achieve crack opening. Consistent degree of effect, improved reliability and construction efficiency

Active Publication Date: 2015-04-29
CHINA PETROLEUM & CHEM CORP +1
View PDF5 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The disadvantage is that it uses a single spray gun, which is prone to incomplete perforation and the formation cannot be opened. The packer used is a hydraulic seated packer. After each stage of fracturing, the well must be backwashed before the coiled tubing can be lifted. , and it is easy to unblock when the coiled tubing displacement is low
In addition, after the perforation is completed, the sand-carrying fluid will be completely displaced from the wellbore. In this way, during the fracturing process, the fluid mainly enters from the fractures opened for the first time, which will be unfavorable for the fractures in the subsequent perforation section to open, resulting in fracturing. The fracture opening degree of each cluster perforation in the fracture section is different, which is not conducive to subsequent oil recovery operations

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Horizontal well multi-cluster fracturing method and multi-cluster perforating and fracturing pipe column for implementing method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] Embodiment of the method for multi-cluster fracturing of horizontal wells in the present invention: the method is a coiled tubing sandblasting multi-cluster perforation suitable for staged fracturing of wellbore cementing and completion of horizontal wells in tight low-permeability sandstone oil and gas reservoirs The annulus fracturing method, taking two clusters per section as an example, briefly describes the implementation process of the coiled tubing sandblasting multi-cluster perforated annular fracturing string, including the following steps:

[0023] 1) Assemble the multi-cluster perforation fracturing string, and test the pressure of the fracturing pipeline and wellhead pump to 70MPa. The pressure drop within 30min does not exceed 0.5MPa. The pressure test of the discharge pipeline is 35MPa, and the pressure drop within 30 minutes does not exceed 0.5MPa. figure 1 As shown, the multi-cluster perforation fracturing string includes coiled tubing 1, tubing joint 2,...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a horizontal well multi-cluster fracturing method and a multi-cluster perforating and fracturing pipe column for implementing the method. In a sand blasting and perforating phase, each perforating section in the same fracturing section is subjected to sand blasting and perforating according to the sequence from top to bottom; after the last time of sand blasting and perforating is finished, sand-carrying liquid in the multi-cluster perforating and fracturing pipe column is substituted to the position above a building up section of a shaft through fracturing base liquid but is not substituted from the shaft, so that when prepad fluid is filled into an annular space between the shaft and the multi-cluster perforating and fracturing pipe column, perforating sand in the sand-carrying liquid blocks a crack opened in the front perforating section to certain degree, and a crack is conveniently opened in a rear perforating section. The opening degrees of the cracks of cluster perforating sections in the same section are consistent, and the reliability and the construction efficiency of section-to-section multi-cluster fracturing are improved.

Description

technical field [0001] The invention relates to a method for multi-cluster fracturing of a horizontal well and a multi-cluster perforation fracturing string for implementing the method. Background technique [0002] At present, domestic horizontal well borehole staged fracturing technologies are mainly coiled tubing staged fracturing and drillable bridge plug staged fracturing. The coiled tubing staged fracturing process is a coiled tubing sandblasting perforation, annulus sand fracturing, which can realize large-scale fracturing. After the fracturing stage is completed, a section of sand plug is left in the wellbore as an isolation, and the pipe string is dragged to the next target section for fracturing. The disadvantages of this process are long construction period and difficulty in flushing the sand plug. The staged fracturing process of drillable bridge plug can realize multi-cluster fracturing, using hydraulic pump to send cables and bridge plug tools to the target la...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21B43/26E21B43/267E21B43/11E21B33/13
CPCE21B33/13E21B43/11E21B43/26E21B43/267
Inventor 王越李克智秦玉英何青陈付虎李国锋罗懿张永春姚昌宇胡艾国
Owner CHINA PETROLEUM & CHEM CORP
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More