Controlled blasting construction method in mountain excavation close to expressway side

A construction method and technology for controlling blasting, applied in blasting and other directions

Active Publication Date: 2015-05-20
中铁十九局集团华东工程有限公司 +1
View PDF4 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Therefore, it is urgent to study a construction method of controlled blasting in the excavation of the mountain near the expressway to solve the problem of not only protecting the operation safety of expressways and ordinary roads, but also protecting the safety of surrounding village houses.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Controlled blasting construction method in mountain excavation close to expressway side
  • Controlled blasting construction method in mountain excavation close to expressway side

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The construction method of controlled blasting in the excavation of mountains adjacent to expressways and existing roads is as follows:

[0032] Step deep hole (5.3m) blasting is adopted for the stonework blasting of the mountain subgrade, pre-splitting blasting and smooth surface blasting are used for the slope, and step shallow hole (about 1m) blasting is used for the high-risk excavation section, and the blasting area is covered with blasting;

[0033] The specific blasting construction sequence is as follows:

[0034] (1) According to the construction plan, before the on-site construction, a protective bent frame is made on the side adjacent to the existing road. The bent frame is composed of steel pipes and bamboo springboards. The height of the bent frame is the height of the blasting mountain plus 2m. The anchor bolts implanted in the mountain are firmly connected to prevent small stones from falling onto the road during blasting.

[0035] (2) The general princi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides s a controlled blasting construction method in mountain excavation close to the expressway side mainly in order to solve the problem that an existing blasting method cannot guarantee safety of an expressway, a common road and village houses around a mountain. The specific construction method includes the steps that step deep hole blasting is adopted for stonework of a subgrade of the mountain, pre-splitting blasting and smooth blasting are adopted for a slope, step narrow hole blasting is adopted for a high-danger excavation road segment, and a blast area is covered with a blasting protection quilt; according to the construction sequence, a protective frame bent is made on the side close to an existing road before construction, the height of the frame bent is 2 m higher than the height of the blasting mountain, and the frame bent is firmly connected to an anchor rod implanted in the mountain; according to the blasting construction sequence, the longitudinal direction of a circuit is arranged according to the length of a blasting circuit, grooving construction of the mountain is firstly performed on the side close to the mountain, then, excavation construction of the mountain close to the road side is performed, and the grooving depth is twice that of the blasting height of the free face of the mountain. The mountain is sequentially constructed from top to bottom and from inside to outside. The method has the advantage that safety of the expressway, the common road and the village houses around the mountain can be guaranteed.

Description

Technical field: [0001] The invention relates to the field of controlled blasting construction methods, in particular to a construction method for controlled blasting in the excavation of mountains near expressways and existing roads. Background technique: [0002] Controlled blasting refers to a blasting method that strictly controls the blasting energy and blasting scale through certain technical measures, so that the blasting sound, vibration, flying stones, dumping direction, damaged area, and the range of broken objects are within the specified limits. [0003] With the continuous development of national railway construction, especially the construction of new railway lines near the existing highways and existing highways is increasing, and sometimes there will be damage to existing ordinary highways due to the occupancy of super large bridge piers. There are cases where ordinary roads are relocated, and the super-large bridge piers are located near expressways and moun...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): F42D1/00F42D3/00
Inventor 任宏伟蒋绪鹏刘利男张玉徐立新徐浩李秀新解佳飞沈光辉卢雷杨军
Owner 中铁十九局集团华东工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products