Multi-time-scale coexisting type management method for railway yard plan station tracks
A railway station yard and management method technology, applied in the field of track management, can solve problems such as lack of historical continuity, unfavorable expansion of track attribute division methods, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] like figure 1 Shown is a flow chart of a multi-temporal co-existing railway station plan track management method provided by the present invention, wherein the track sub-curve includes design attributes and temporal attributes, and one or more segment track sub-curves are based on their own design attributes. The starting point data and the end point data form a structural chain of the stock track, and the method comprises the following steps:
[0026] In step 201, the channel sub-curves are divided into one or more groups of channels according to the temporal attributes.
[0027] Wherein, the temporal attribute includes present tense, recent tense and future tense. In an optional solution, the temporal attributes include: multi-temporal attributes such as existing, new, recent stock market, and long-term stock market. In each embodiment of the present invention, only the current tense, recent The description of the three situations of tense and future tense, and thos...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com