A foundation pit and marking technology, which is used in measuring instruments, measuring devices, surveying and mapping, and navigation, etc., can solve problems such as the trouble of burying rebound markers and observation, and cannot achieve layered observation or constant observation, saving observation time. , Speed up the deformation observation speed, the effect is remarkable
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] Such as Figure 1 to Figure 3 As shown, this embodiment provides a foundation pit rebound observation mark that is convenient for layered observation, including a base 1, an observation rod 2 arranged on the base 1, and an observation mark 4, and the observation mark 4 is arranged on the top of the observation rod 2; The observation rod 2 includes five observation units 3 connected end to end in sequence, and the observation unit 3 includes a connecting rod 6 and a protective sleeve 5 that are sleeved inside and outside; According to the different requirements of actual observation, the observation pole can be selected to include observation poles with different numbers of observation units.
[0048] Wherein, the observation mark 4 is an independent part, which can be installed on the top of each observation unit 3, and the observation mark 4 is as image 3 As shown, the shape is a bolt column, and its top is a spherical ball.
[0049] The base 1 is a square steel pla...
Embodiment 2
[0053] A method for observing the springback amount of a foundation pit by using the rebound observation mark of the foundation pit convenient for layered observation described in embodiment 1, comprising the following steps,
[0054] (1) Set up observation points: According to the existing technology, five foundation pit springback observation marks are respectively embedded in the foundation pit springback observation points in the foundation pit, and each foundation pit springback observation point is respectively marked with J1, J2, J3, J4, J5 means; (the quantity and layout of observation points for foundation pit springback can be set in accordance with the requirements of 5.3.2 of the "Building Deformation Measurement Specification" (JGJ 8-2007)) and set benchmarks and two observation turning points outside the foundation pit , where: the benchmarking point is denoted by BM, and each observation turning point is denoted by TP1 and TP2 in turn; Figure 5 shown.
[0055]...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com