A method for installing bundle tubes in gobs in fully mechanized caving face
A fully-mechanized working face and installation method technology, applied to mining equipment, measuring equipment, mining equipment, etc., can solve the problems of increased danger, high labor intensity, and slowing down the movement speed of operators under the hydraulic support.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0027] Such as figure 1 , the bundle pipe 6 of the fully mechanized caving face of the present invention is installed in the goaf 4, and the bundle pipe 6 and the protective steel pipe 5 are transported and installed in the working space 2. The working space 2 is located below the swing tail boom 11 of the hydraulic support 1, and the swing tail boom 11 is used to support the coal and rocks that have fallen from the roof during the fully mechanized caving coal mining process. The conveyor 3 is located in the work space 2, and the conveyor 3 It is the rear conveyor. Usually, in the coal mining process, the coal cut by the shearer is firstly transported by the front conveyor, and then the coal that has been dropped from the upper part is transported out by the rear conveyor. After the coal is transported out, a goaf 4 is formed behind ...