Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

GJB5000A-based software development process monitoring method and system

A development process and software technology, applied in the direction of program control devices, etc., can solve the problems that it is difficult to support GJB5000A level 4 or level 5 process improvement, cannot completely cover GJB5000A, and has not realized integrated project management, so as to improve the efficiency of R&D work and facilitate Effects of installation and maintenance, ensuring data security

Inactive Publication Date: 2015-09-02
华北计算技术研究所
View PDF7 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] (1) The requirements of GJB5000A are not fully covered: the existing software project management system has not been developed in strict accordance with the requirements of GJB5000A, resulting in its inability to fully cover each process area of ​​GJB5000A;
[0004] (2) Unrealized integrated project management: In the existing software project management system, various process activities such as configuration management, demand management, and project monitoring are developed as relatively independent management tools, and integrated management has not been realized;
[0005] (3) It is difficult to support the implementation of GJB5000A four-level process improvement by various military industrial units and scientific research institutes: because the existing software project management system does not completely cover each process area of ​​GJB5000A, and there is continuity among the five levels of GJB5000A, each level constitutes A level of process improvement foundation in progress is the basis for realizing the next maturity level, and each level cannot be crossed. Therefore, the existing software project management methods and systems are difficult to support various units and scientific research institutes to implement GJB5000A level 4 or 5 process improvement
[0006] It can be seen that the existing GJB5000A-based software development process monitoring method obviously has inconvenience and defects in method and use, and needs to be further improved urgently.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • GJB5000A-based software development process monitoring method and system
  • GJB5000A-based software development process monitoring method and system
  • GJB5000A-based software development process monitoring method and system

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment

[0039] An integrated software project management system based on GJB5000A, which consists of web server, report server, database server, license server, project planning, project tracking, configuration management, review, demand management, risk management, quality assurance, process data management, Quality Control, Supplier Agreement Management, Training Management, Process Asset Management, Process Definition, Defect Management, Statistical Analysis, and End Equipment Components. Each module is connected to the database, the terminal device is connected to the web server and the report server through the network, and the web server is connected to the License server. The software project management process is designed in strict accordance with the GJB5000A standard, covering the second, third, and fourth process domains of GJB5000A. Based on the entered project management data, statistical charts and statistical tables that meet the requirements of the GJB5000A software pro...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a GJB5000A-based software development process monitoring method and system. The method comprises the following steps: A) generating a life cycle model; B) querying a database according to the life cycle model selected by a user, and feeding back corresponding progress plan information; C) creating WBS decomposition, cyclically traversing each node of a progress plan and displaying the progress plan through a tree structure; D) performing task assignment; E) updating task state information according to a task accomplishment instruction triggered by the user, and recording a time node of the state; F) periodically generating a project tracking report. The system mainly consists of projection planning and project monitoring function modules, automatic collection, sorting and statistic of software project data are supported, software project managers are helped to quickly understand software project states in real time to make scientific decisions, and various military units and scientific research institutions are supported to implement software project management and process improvement according to GJB5000A requirements.

Description

technical field [0001] The invention relates to the field of software project management, in particular to a GJB5000A-based software development process monitoring method and system. Background technique [0002] The current software project management systems on the market mainly have the following shortcomings: [0003] (1) The requirements of GJB5000A are not fully covered: the existing software project management system has not been developed in strict accordance with the requirements of GJB5000A, resulting in its inability to fully cover each process area of ​​GJB5000A; [0004] (2) Unrealized integrated project management: In the existing software project management system, various process activities such as configuration management, demand management, and project monitoring are developed as relatively independent management tools, and integrated management has not been realized; [0005] (3) It is difficult to support the implementation of GJB5000A four-level process...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F9/44
Inventor 关昕胡丹王金辉陈理国
Owner 华北计算技术研究所
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products