A method for simulating the whole process of tunnel excavation
A technology of tunnel excavation and simulation method, which is applied in the direction of instrumentation, calculation, electrical digital data processing, etc., and can solve the problems that the third principal stress cannot be considered
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] A method for simulating the whole process of tunnel excavation, the method comprising the steps of:
[0017] 1) Obtain the creep law of the surrounding rock through the rock creep test: take cores from the surrounding rock of the tunnel to be simulated, process it into a cylindrical specimen with a diameter of 50mm and a height of 100mm, and conduct a traditional uniaxial creep test to obtain different axial stresses Under the state, the creep strain of the specimen varies with time.
[0018] 2) Use the ANASYS implicit creep equation to fit the creep results:
[0019]
[0020] Among them, ε cr is the equivalent rock creep strain, t is the time, σ is the rock equivalent stress, e is the natural constant, T is the temperature, is the equation parameter (the rock parameter obtained by fitting the experiment);
[0021] When the temperature effect is not considered, the parameter c 4 and c 7 is zero, the equation can simulate the initial stage of creep and the secon...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com


