Connecting structure of main chords and web members of tower crane
A tower crane and connecting structure technology, applied in cranes and other directions, can solve the problems of inflexible installation, inability to disassemble, and large welding processing volume, so as to improve the safety and convenience, save the cost of delivery vehicles, and reduce the production cost. The effect of freight transportation costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0015] The present invention will be further described below in conjunction with accompanying drawing.
[0016] Such as figure 2 As shown, a connection structure between the main chord and the web of a tower crane includes the main chord 1 and the web, the web includes the diagonal web 2 and the beam web 3, the two ends of the beam web 3 and the main The chord 1 is connected, and one end of the diagonal web 2 is connected with the main chord 1, and the main chord 1 is detachably connected with the diagonal 2 and the beam web 3.
[0017] Preferably, both ends of the oblique web member 2 and the beam web member 3 are connected by pins, and the two ends and the middle part of the main chord 1 are respectively welded with ear plates IB and ear plates IIC, and the pins pass through the ear plates IB or lug plate IIC and the ends of the diagonal web 2 or the beam web 3 realize the connection of the main chord 1 with the diagonal 2 and the beam web 3 .
[0018] Preferably, at leas...