An optimization method, device and system for an air interface long connection

An optimization method and long-term connection technology, applied in the field of communication, can solve problems such as unsatisfactory real-time service push and high air interface overhead

Active Publication Date: 2019-04-23
CHINA MOBILE COMM GRP CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The embodiment of the present invention provides an optimization method, device and system for long air interface connections, which are used to solve the existing problems such as high air interface overhead and inability to meet the real-time nature of service push due to the need for regular release of long air interface long connections

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • An optimization method, device and system for an air interface long connection
  • An optimization method, device and system for an air interface long connection
  • An optimization method, device and system for an air interface long connection

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0034] Embodiment 1 of the present invention provides an optimization method for long air interface connections, such as figure 1 As shown in FIG. 1 , it is a schematic flowchart of the method for optimizing a long air interface connection according to Embodiment 1 of the present invention. The method may include the following steps:

[0035] Step 101: The RAN network platform receives the first trigger instruction sent by the service-side device. The first trigger instruction is sent to the RAN network platform when the service-side device determines that there is a service to be pushed locally that meets the set conditions. sent.

[0036] Specifically, the service to be pushed that satisfies the set condition may be a service whose real-time performance exceeds the set first threshold, or may be a service whose real-time performance exceeds the set first threshold and the data volume does not exceed the set second threshold . For example, the service to be pushed that sati...

Embodiment 2

[0060] Embodiment 2 of the present invention takes the executor as an example of a service-side device to further describe the method for optimizing the air interface long connection described in Embodiment 1 of the present invention, as follows figure 2 As shown, it is a schematic flow chart of the optimization method described in Embodiment 2 of the present invention, and the method may include the following steps:

[0061] Step 201: The service-side device judges whether there is a local service to be pushed that satisfies the set condition.

[0062] Specifically, the service to be pushed that satisfies the set condition may be a service whose real-time performance exceeds the set first threshold, or may be a service whose real-time performance exceeds the set first threshold and the data volume does not exceed the set second threshold . For example, the service to be pushed that satisfies the set conditions may be a service to be pushed with a small amount of data and hi...

Embodiment 3

[0076] The third embodiment of the present invention takes the interactive execution of the RAN network platform and the service side equipment as an example, and further explains the optimization method of the air interface long connection described in the first or second embodiment of the present invention, as follows image 3 As shown, it is a schematic flow chart of the method for optimizing long air interface connections described in Embodiment 3 of the present invention, and the method may include the following steps:

[0077] Step 301: The service side device judges whether there is a local service to be pushed that satisfies the set condition, and sends a first trigger instruction to the RAN network platform if the judgment result is yes.

[0078] Specifically, the service to be pushed that satisfies the set condition may be a service whose real-time performance exceeds the set first threshold, or may be a service whose real-time performance exceeds the set first thresh...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention discloses an optimizing method of an air interface long connection, equipment and a system. The method comprises the following steps that: a radio access network (RAN) platform receives a first trigger command sent by service side equipment, the first trigger command is sent to the RAN platform by the service side equipment when service to be pushed which satisfies a set condition exists in the local; the air interface long connection with the terminal is established according to the first trigger command, and the service to be pushed received from the service side equipment is sent to the terminal through the air interface long connection. In this way, in the technical scheme of the invention, the RAN platform can establish the air interface long connection with the terminal according to the first trigger command issued by the service side equipment, the air interface long connection establishment mode based on service trigger is realized, and on the basis of satisfying the service pushing, the effect of reducing air interface overhead is achieved.

Description

technical field [0001] The present invention relates to the technical field of communication, in particular to an optimization method, equipment and system for air interface long connection. Background technique [0002] Among the many existing OTT (Over The Top, Internet-based application services) data services, many services need to be sent to terminals through wireless long-connection links, such as real-time services such as wireless payment and sending verification codes. These services have high requirements on reliability and delay, and must arrive within a relatively short period of time (usually at the second level), and have extremely high requirements on security, and need to avoid multiple retransmissions as much as possible. [0003] In the prior art, for the terminal side device, the long connection of TCP (Transmission Control Protocol, Transmission Control Protocol) can be maintained by sending a very frequent heartbeat to the server side, so as to ensure a ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H04W76/11H04W76/20
Inventor 李刚段然陈亚迷韩双锋
Owner CHINA MOBILE COMM GRP CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More