Integrated monitoring and automatic emergency decision processing method and device for distributed computer room
A technology of comprehensive monitoring and processing methods, applied in digital transmission systems, electrical components, error prevention, etc., can solve problems such as large manpower, inability to guarantee fault detection, inability to classify various fault information, etc., to improve efficiency and improve system robustness sexual effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0068] Example 1: Fault decision analysis processing server 6 failure situation
[0069] Fault decision analysis and processing server 5: Unable to connect to fault decision analysis and processing server 6;
[0070] Fault decision analysis and processing server 5: Generate a fault code of "unable to connect to fault decision analysis and processing server 6";
[0071] Fault decision analysis and processing server 5: the fault status is sent to the monitoring screen 1, tablet computer 2 and smart phone 3 for display;
[0072] Fault decision analysis processing server 5: call short message server 7 to send fault status of fault decision analysis processing server 2 to relevant personnel
[0073] Fault decision analysis and processing server 5: continue monitoring according to the work process.
Embodiment 2
[0074] Example 2: SMS server 8 failure situation
[0075] Fault decision analysis and processing server 5: unable to connect to SMS server 8;
[0076] Fault decision analysis and processing server 5: generate the fault code of "unable to connect to SMS server 8";
[0077] Fault decision analysis and processing server 5: the fault status is sent to the monitoring screen 1, tablet computer 2 and smart phone 3 for display;
[0078] Fault decision analysis and processing server 5: call short message server 7 to send the fault state of short message server 8 to relevant personnel
[0079] Fault decision analysis and processing server 5: continue monitoring according to the work process.
Embodiment 3
[0080] Example 3: Power outages at the computer room level
[0081] Fault decision analysis and processing server 5: the uninterruptible power supply 13 on the machine room floor starts to start;
[0082] Fault decision analysis and processing server 5: generate a fault code of "power failure at the computer room layer";
[0083] Fault decision analysis and processing server 5: the fault status is sent to the monitoring screen 1, tablet computer 2 and smart phone 3 for display;
[0084] Fault decision analysis and processing server 5: call SMS server 7 to send the fault status of power failure at the computer room floor to relevant personnel
[0085] Fault decision analysis and processing server 5: continue monitoring according to the work process.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com