A bridge pier column reinforcement installation and operation frame

A technology for operating frames and bridges, which is applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc. It can solve the problems of large installation and dismantling, deflection and inclination of scaffolding, low construction efficiency, etc., and achieves simple operation and excellent structure. Lightweight, easy-to-make effects

Active Publication Date: 2017-08-29
SINOHYDRO BUREAU 5
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, the installation of steel bars for bridge pier columns mostly adopts the overturning method. In the construction process, scaffolding is an indispensable equipment. Now ordinary fastener-type steel pipe scaffolding or buckle-type scaffolding is commonly used. This type of scaffolding is in the construction process. Diagonal braces, scissor braces, and necessary reinforcement structures need to be set up in time to avoid deflection and inclination during the erection of the scaffold. At the same time, it is necessary to use butt fasteners to fix the steel pipe joints. The construction requirements are high and the process is complicated. Installation and dismantling The amount of work is also very large, especially for super-high variable-section rectangular piers with relatively large amount of steel reinforcement, and piers whose bridge sites are in valleys and rivers. very inefficient

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A bridge pier column reinforcement installation and operation frame
  • A bridge pier column reinforcement installation and operation frame
  • A bridge pier column reinforcement installation and operation frame

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments. like figure 1 As shown, a bridge pier column reinforcement installation and operation frame includes two independent steel pipe frames 2, the cross section of which is U-shaped, and when combined, the U-shaped free end faces of the two steel pipe frames Surrounding the periphery of the bridge pier column 1 , the corresponding two free end surfaces are fixedly connected by the combination fastener 4 . The steel pipe frame is welded with φ57×3mm steel pipes.

[0017] The combination of the two steel pipe frame options is as follows figure 2 As shown, the combination fastener 4 includes a fastener body 42, and a combination card slot 43 is provided at the left and right ends of the fastener body 42; The two connecting cross bars 21 are respectively clipped in the combination slots 43 at the left and right ends of the same fastener body...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an operation frame for installation of bridge pier column steel bars. The operation frame comprises two steel pipe frames. The cross section of each steel pipe frame is in a U shape. The free end faces of the two steel pipe frames correspond to each other to surround the periphery of a bridge pier column, and the two corresponding free end faces are fixedly connected through a combined fastener. The combined fastener comprises a fastener body, wherein the left end and the right end of the fastener body are each provided with a combined clamping groove. Connecting cross rods are arranged on the free end faces of the steel pipe frames. The two connecting cross rods on the corresponding free end faces are clamped in the combined clamping grooves in the left end and the right end of the same fastener body in a sleeved mode correspondingly. The operation frame is light and simple in structure, easy to manufacture and not limited by a construction site, easy and convenient to operate in the construction process, safe and reliable and capable of being moved flexibly and used repeatedly, the bridge construction progress is accelerated, and the engineering cost is reduced.

Description

technical field [0001] The invention relates to the technical field of steel bar installation facilities for bridge pier columns, in particular to a bridge pier column steel bar installation and operation frame. Background technique [0002] At present, the installation of steel bars for bridge pier columns mostly adopts the overturning method. In the construction process, scaffolding is an indispensable equipment. Now ordinary fastener-type steel pipe scaffolding or buckle-type scaffolding is commonly used. This type of scaffolding is in the construction process. Diagonal braces, scissor braces, and necessary reinforcement structures need to be set up in time to avoid deflection and inclination during the erection of the scaffold. At the same time, it is necessary to use butt fasteners to fix the steel pipe joints. The construction requirements are high and the process is complicated. Installation and dismantling The amount of work is also very large, especially for super-h...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 钟长海段建军罗万里
Owner SINOHYDRO BUREAU 5