Temporary pipeline lower hoisting bracket and trench excavating pipeline protection method

A technology for pipeline protection and brackets, which is applied in the direction of pipeline supports, pipes/pipe joints/fittings, mechanical equipment, etc., to achieve the effect of simple construction and no delay in construction period

Active Publication Date: 2016-07-20
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP NO 4 ENG
View PDF7 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to solve the problem that the gas pipeline and water supply pipeline cannot be relocated twice during the excavation of the foundation pit on site, the invention ensures that the gas pipeline and water supply pipeline cannot be moved or significantly settled, and provides a hoisting bracket under the temporary pipeline. Frame and excavation trench pipeline protection method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Temporary pipeline lower hoisting bracket and trench excavating pipeline protection method
  • Temporary pipeline lower hoisting bracket and trench excavating pipeline protection method
  • Temporary pipeline lower hoisting bracket and trench excavating pipeline protection method

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach 1

[0020] Specific implementation mode one: combine Figure 1 ~ Figure 4 Describe this embodiment, this embodiment comprises cross bar 1, vertical rod 2, suspender 3, diagonal brace 4, bracket 5, connecting plate 6 and cross bar nut 7, and vertical bar 2 and suspender 3 are vertically arranged on the cross bar 1, the vertical rod 2 is located at the lower end of the cross bar 1 and is welded with the cross bar 1, the upper end of the suspender 3 passes through the cross bar 1 and the connecting plate 6 and is threaded with the cross bar nut 7, and the lower end of the suspender 3 is connected with the bracket The frame 5 is detachably connected, and the diagonal brace 4 is arranged between the cross bar 1 and the vertical rod 2. One end of the diagonal brace 4 is connected with the cross bar 1, and the other end of the diagonal brace 4 is connected with the vertical rod 2. Use #83 angle steel as the diagonal brace.

specific Embodiment approach 2

[0021] Specific implementation mode two: combination figure 1 To illustrate this embodiment, the horizontal bar 1 of this embodiment is butt-welded by two channel steels to form a rectangle, and is strengthened by an embossing plate 8 at the position of the weld, and the vertical bar 2 is butt-welded by two channel steels to form a rectangle, and is used at the position of the weld The patch plate 8 is strengthened. The channel steel adopts #10 channel steel. Other components and connections are the same as those in the first embodiment.

specific Embodiment approach 3

[0022] Specific implementation mode three: combination figure 1 Describe this embodiment, the bracket 5 of this embodiment comprises upper board 5-1, lower board 5-2, two round bars 5-3 and four hanger nuts 5-4, upper board 5-1 and lower board 5-2 is set up and down in parallel, two round steel 5-3 are set in parallel, upper plate 5-1, lower plate 5-2 and two round steel 5-3 form the frame body, the upper end of each round steel 5-3 wears Pass the upper plate 5-1 to be threaded with a hanger nut 5-4, and the lower end of each round steel 5-3 passes through the lower plate 5-2 to be threaded with a hanger nut 5-4. The dimensions of the upper plate 5-1 and the lower plate 5-2 are: length 350mm, width 100mm, thickness 20mm. Round steel 5-3 diameter 20mm. Other compositions and connections are the same as those in Embodiment 1 or 2.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a temporary pipeline lower hoisting bracket and a trench excavating pipeline protection method. According to the hoisting bracket, a vertical rod and a suspender are arranged at the two ends of a cross rod, the vertical rod is welded to the cross rod, the upper end of the suspender is in threaded connection with a cross rod nut, and the lower end of the suspender is detachably connected with the bracket. An inclined strut is arranged between the cross rod and the vertical rod. The method comprises the steps that firstly, two hoisting brackets are arranged at the two longitudinal ends of the top of a foundation pit crown beam, and the distance between each vertical rod and the end of the foundation pit crown beam ranges from 4 m to 6 m; secondly, a crown beam top steel plate is fixed to the foundation pit crown beam through expansion bolts; thirdly, the vertical rods and the crown beam top steel plate are in full weld; fourthly, a lower plate is placed in each groove, a gas pipeline and a water supply pipeline are both located in a frame body of each bracket, each lower plate and corresponding two pieces of round steel are assembled, bracket nuts are screwed, and each bracket is connected with the corresponding suspender; fifthly, after a foundation pit is excavated, when a return pipe network trench is excavated to the position near each bracket, a trench construction side needs to screw suspender nuts on the brackets by a half circle again. The temporary pipeline lower hoisting bracket and the trench excavating pipeline protection method are used for temporary pipeline protection before foundation pit excavation in the municipal engineering.

Description

technical field [0001] The invention relates to a bracket used for underground pipeline hoisting and a pipeline protection method, in particular to a hoisting bracket under a temporary pipeline and a method for protecting a trenched pipeline. Background technique [0002] At present, before the excavation of the foundation pit of municipal engineering (including water supply pipelines, communication pipelines, rainwater pipelines, sewage pipelines, and power pipelines), it is necessary to temporarily relocate the existing gas pipelines and water supply pipelines to the foundation pit (that is, above the surface) ), the purpose of doing this is not to affect the normal use of gas and water supply. When the gas pipeline and water supply pipeline are moved back, the area for trench excavation is just below the existing temporarily relocated gas pipeline and water supply pipeline. Due to time constraints and small site, the gas pipeline and water supply pipeline cannot be reloc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): F16L3/11F16L3/10
CPCF16L3/1066F16L3/11
Inventor 刘洪双沈阳曲春国
Owner CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP NO 4 ENG