Method and device for selecting power distribution network power supply reliability enhancement scheme
A technology of reliability and distribution network, applied in the field of electric power, which can solve the problems of difficult input-output, quantification, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0085] This embodiment provides a method for selecting a distribution network power supply reliability improvement scheme. The flow chart of the method is as follows figure 1 shown, including the following steps:
[0086] S1: According to the key data of the power supply reliability improvement plan of the distribution network, establish the functional relationship between the key data of the reliability improvement plan and the reliability improvement plan, and construct the reliable power outage time and pre-arranged power outage time The reliability evaluation prediction model, and the reliability evaluation prediction model of the fault power outage time and the pre-arranged power outage time are summarized, and the power supply reliability comprehensive evaluation model of the distribution network is obtained;
[0087] First, according to the basic state of the power grid, it is necessary to pre-set the key data of the power supply reliability improvement scheme of the di...
Embodiment 2
[0144] This embodiment provides a device for selecting a power supply reliability improvement scheme of a distribution network. The structural diagram of the device is as follows image 3 shown, including:
[0145] The distribution network power supply reliability comprehensive evaluation model construction unit 1 is used to establish a function between the key data of the reliability improvement scheme and the reliability improvement scheme according to the key data of the power supply reliability improvement scheme of the distribution network relationship, build a reliability assessment prediction model for fault outage time and pre-arranged outage time, and summarize the reliability evaluation and prediction models for the fault outage time and pre-arranged outage time to obtain a comprehensive evaluation of the power supply reliability of the distribution network Model;
[0146] The constraint type determining unit 2 is used to determine the constraint type. The constrain...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com