Biological Control Methods of Soil Erosion in Steep Slope Gullies in Low Mountains and Hills of Yili River Valley
A soil erosion and valley technology, applied in botany equipment and methods, soil protection, plant cultivation, etc., can solve the problems of micro-ecological environment and vegetation development heterogeneity, poor soil and water conservation measures, and large slopes , to achieve the effect of strong suitability, long water and soil conservation time and good effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0014] a. Choose a steep valley with a ditch length of 30m and steep slopes of 15° on both sides, and excavate a continuous intercepting ditch along the contour line at the upper, middle and lower parts of the slope on the sunny side of the valley. The width of the intercepting ditch is 40cm, 30cm deep, hole planting is adopted between the 3 cut-off ditch belts, and the 2-year-old seedlings of the local drought-tolerant sun-loving shrub Hypericum spiraea are replanted with a row spacing of 2×2m, and the tree planting pit is in the shape of "pin" Excavate with a diameter of 40cm and a depth of 50cm, plant spiraea chinensis, fill the soil to 20cm below the surface, step on it, cover the surface soil with 10cm, and keep 10cm without filling, so as to realize the interception ditch and the upper part of the tree planting pit Step-by-step storage of runoff and sediment on the slope surface, and use of rainfall and snowmelt water to tend and replant shrubs;
[0015] b. Excavate a co...
Embodiment 2
[0018] a. Choose a steep valley with a ditch length of 30m and a steep slope of 18° on both sides, and excavate one, two and three intermittent interception water along the contour line at the upper, middle and lower parts of the slope on the sunny side of the valley. The intercepting ditch is 400cm long, 40cm wide, and 30cm deep, and the horizontal distance is 1m. Replant 2-year-old seedlings of the native drought-tolerant sun-loving shrub Hypericum spiraea with a row spacing of 2×2m. The tree planting pit is excavated in the shape of a "pin", with a diameter of 40cm and a depth of 50cm. Fill the soil to 20cm below the surface, step on it, cover the surface soil 10cm, keep 10cm without filling, realize the step-by-step retention of runoff and sediment on the slope surface in the intercepting ditch and the upper part of the tree planting pit, and use rainfall and snowmelt water to nourish and replenish Plant shrubs;
[0019] b. Excavate a continuous intercepting ditch along t...
Embodiment 3
[0022] a. Select a steep valley with a ditch length of 30m and a steep slope of 20° on both sides, and excavate one, two and three intermittent interception water along the contour line at the upper, middle and lower parts of the slope on the sunny side of the valley The intercepting ditch is 400cm long, 40cm wide, and 30cm deep. The horizontal distance is 1m. The 2-year-old seedlings of the drought-loving shrub Caragana chinensis; the 2-year-old seedlings of the native drought-tolerant sun-loving shrub Hypericum spiraea are replanted between each intercepting ditch with a row spacing of 2×2m, and the tree planting pits are in the shape of "pin" Excavate with a diameter of 40cm and a depth of 50cm, plant spiraea chinensis, fill the soil to 20cm below the surface, step on it, cover the surface soil with 10cm, and keep 10cm without filling, so as to realize the opposite slope between the intercepting ditch and the upper part of the tree planting pit Step-by-step storage of surfa...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More