A kind of preparation method of hard emulsified asphalt
A technology for emulsified asphalt and hard asphalt, which is applied in building components, building insulation materials, buildings, etc., can solve the problems of hard emulsified asphalt that has not been researched and no reports of hard emulsified asphalt materials, etc., to achieve good economic effects, storage Good stability and low viscosity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] The preparation method of the hard emulsified asphalt of the present embodiment comprises the following steps:
[0026] Step 1, taking by weighing various raw materials in mass percentages as shown in Table 1;
[0027] Table 1 Embodiment 1 Hard emulsified asphalt raw material formula
[0028]
[0029]
[0030] Step 2: Heat No. 50 hard asphalt to 145°C, then add lake asphalt, Qingchuan rock asphalt, dispersible latex powder and polyphosphoric acid to the heated No. 50 hard asphalt and stir evenly to obtain a mixture;
[0031] Step 3: Heat the water to 80°C, then add the organic stabilizer, inorganic stabilizer and emulsifier into the hot water and stir evenly to obtain soap liquid, and then use hydrochloric acid to dissolve the soap under the condition that the temperature of the soap liquid is 65°C The pH value of the solution was adjusted to 1.8;
[0032] Step 4, adding the soap liquid after pH adjustment in step 3 into a colloid mill and grinding for 2.5 minut...
Embodiment 2
[0038] The difference between the preparation method of hard emulsified asphalt in this example and the method described in Example 1 is that the heating temperature of No. 50 hard asphalt described in step 2 is 140°C, and the temperature of the soap solution described in step 3 The temperature is 60°C, and the grinding time in step 4 is 3 minutes.
[0039] After testing, all the indicators of the hard emulsified asphalt prepared in this embodiment meet the requirements of "Technical Specifications for Asphalt Pavement Construction" (JTG F40-2004).
Embodiment 3
[0041] The difference between the preparation method of hard emulsified asphalt in this example and the method described in Example 1 is that the heating temperature of No. 50 hard asphalt described in step 2 is 150°C, and the temperature of the soap solution described in step 3 The temperature is 70°C, and the grinding time described in step 4 is 2 minutes.
[0042] After testing, all the indicators of the hard emulsified asphalt prepared in this embodiment meet the requirements of "Technical Specifications for Asphalt Pavement Construction" (JTG F40-2004).
PUM
| Property | Measurement | Unit |
|---|---|---|
| penetration | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


