A nuclear power plant auxiliary steam system and treatment method
A technology for auxiliary steam and nuclear power plants, which is applied to auxiliary equipment of nuclear power plants, nuclear power generation, and reduction of greenhouse gases. , simplify equipment configuration, and achieve the effect of inclusive design
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] An embodiment of the present invention provides an auxiliary steam system of a nuclear power plant, see figure 1 , the system consists of:
[0062] The main steam pipeline 10 is connected to the secondary circuit of the nuclear power plant, and is used to transmit the main steam generated by the secondary circuit;
[0063] The steam conversion component 20 is connected to the main steam pipeline 10, and is used to depressurize the main steam and convert it into auxiliary steam;
[0064] At least one auxiliary steam pipeline assembly 30 is connected to the steam converting assembly 20 for transmitting the converted auxiliary steam to the unit user 40 .
[0065] Specifically, see figure 2 , the auxiliary steam pipe assembly 30 includes a first auxiliary steam pipe assembly and a second auxiliary steam pipe assembly arranged in parallel,
[0066] The first auxiliary steam pipeline assembly includes a first isolation valve 301 and a first auxiliary steam pipeline 302, t...
Embodiment 2
[0082] The present invention provides a treatment method for auxiliary steam of a nuclear power plant, which is suitable for the auxiliary steam system of a nuclear power plant shown in Embodiment 1, see image 3 , the method includes:
[0083] S1. Receive and transmit the main steam generated by the secondary circuit of the nuclear power plant;
[0084] S2, converting the main steam into auxiliary steam after decompression;
[0085] S3. Transmitting the converted auxiliary steam to the user 40 of the unit.
[0086] Specifically, see Figure 4 , step S2 includes:
[0087] S21. Determine whether the main steam isolation valve is open, and synchronously control the closing or opening of the pneumatic valve 201 according to the shut-off state;
[0088] In this embodiment, the closing time of the pneumatic valve 201 is less than 5 seconds, and by controlling the synchronization of the pneumatic valve 201 and the main steam isolation valve, the problem of using STR deaerators, ...
Embodiment 3
[0106] An embodiment of the present invention provides an auxiliary steam system of a nuclear power plant, see Figure 5 , the system includes a steam conversion assembly 20, an auxiliary steam pipeline assembly 30 and a unit user 40, wherein the auxiliary steam pipeline assembly 30 and the unit user 40 are the same as those of the first embodiment figure 2 same, the difference is that the auxiliary steam system of this embodiment also includes:
[0107] The steam turbine 70 is connected between the main steam pipeline 10 and the pneumatic valve 201, and is used to convert the main steam into wet steam through six stages of steam extraction;
[0108] The steam-water separation box 203 is connected between the pneumatic valve 201 and the pressure reducing valve 202 , and is used to dehumidify the wet steam, and transmit the dehumidified main steam to the pressure reducing valve 202 .
[0109]In this embodiment, the main steam becomes wet steam with a pressure of 2 MPa.a and a...
PUM