At the time of initial start-up, two or more storage units are started as a start-up control unit so that the total power consumption will not exceed specified electric power.
Upon initial start-up of additional chassis, a CPU 214 for a basic chassis 400 selects, based on predicted power consumption for additional chassis 410, 412, etc., N additional chassis as a start-up control unit so that total power consumption for the basic chassis 400 and the respective additional chassis 410, 412 as recognized by an external power source 600 will not exceed the specified electric power; and the CPU 214 then turns on auxiliary power switches 510, 512 for the additional chassis 410, 412 belonging to the selected start-up control unit.