Installing structure for shield arrival temporary waterproof device without main structure and construction method of installing structure
A technology of main structure and waterproof device, applied in vertical shaft equipment, earthwork drilling, wellbore lining, etc., can solve the problems of prolonging construction progress and construction period, prolonging process conversion time, affecting construction efficiency, etc., so as to shorten construction progress and construction efficiency. The effect of cycle, saving process conversion time and improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0036] Example one:
[0037] see Figure 1-2 , in the figure, the shield of the present invention reaches the installation structure of the temporary waterproof device without the main structure, including the connecting steel ring 1, the double-row steel bar 2, the steel mesh sheet 3, and the concrete 5.
[0038] Among them, the connecting steel ring is located on the ground connecting wall 6, and is matched with the set hole door. The double-row reinforcing bars are arranged circumferentially on the outside of the connecting steel ring, and are implanted in the ground connecting wall, and the implanted double-row reinforcing bars and the connecting steel ring are arranged coaxially. The outer protruding ends of the connecting steel ring and the double-row reinforcement are welded and fixed. Reinforcing meshes are bound on the outer protruding ends of the double-row reinforcing bars, and C30 concrete is moulded to seal the gap between the connecting steel ring and the groun...
Example Embodiment
[0050] Embodiment 2:
[0051] see figure 2 , the structure of this embodiment is similar to that of the first embodiment, and the same parts of its structure will not be repeated here, the difference is: this embodiment also includes a full-ring cut-out hole 8 in the inner side of the connecting steel ring, and the cut-out hole The depth of the reinforced bar is the same as the depth of the planted bar, which is used to reduce the disturbance to the connection position of the steel ring when the shield tunneling tool cuts the hole door.
[0052] The specific construction steps 1 to 4 of this embodiment are shown in Embodiment 1, which will not be repeated here. The difference is that it also includes step 5, full-circle drilling inside the cave door:
[0053]On the inner side of the connecting steel ring, the whole ring of the tunnel door is cut, and the cutting depth is consistent with the depth of the planting bar, so as to reduce the disturbance to the connection position...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap