Adjusting method and apparatus for constrained condition of power-off plan
A technology of constraint conditions and power outage planning, applied in the field of electric power, can solve the problems of high work intensity, low efficiency, time-consuming and labor-intensive effects of constraint conditions, and achieve the effect of reducing workload and improving adjustment efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] see figure 1 A flowchart of a method for adjusting constraints in a power outage plan is shown, the method includes the following steps:
[0029] Step S102, obtain the power outage equipment to be planned, the outage window period of the outage equipment and the constraint conditions; wherein, the outage window period is determined according to the power flow data and / or equipment attributes of the outage equipment; the constraint condition is based on the grid characteristics of the power system, and Generation of preset power outage maintenance tasks and power system operation rules;
[0030] Step S104, according to the above-mentioned blackout window period and constraints, judge whether the convergence result of the blackout plan can be obtained; wherein, the convergence result includes the blackout date of the blackout equipment satisfying the blackout window period and the constraint conditions;
[0031] In actual implementation, it is usually possible to calcula...
Embodiment 2
[0051] Corresponding to the above method embodiment, see image 3 A structural schematic diagram of a device for adjusting constraints in a power outage plan is shown, the device includes the following parts:
[0052] The obtaining module 302 is used to obtain the power outage equipment to be planned, the outage window period of the outage equipment and the constraint conditions; wherein, the outage window period is determined according to the power flow data and / or equipment attributes of the outage equipment; the constraint condition is determined according to the power grid of the power system characteristics, as well as pre-set outage maintenance tasks and power system operation rule generation;
[0053] Judging module 304, used to judge whether the convergence result of the power outage plan can be obtained according to the power outage window period and the constraint conditions; wherein, the convergence result includes the power outage date of the power outage equipment...
PUM

Abstract
Description
Claims
Application Information

- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com