A kind of manufacturing method of three-way mold
A manufacturing method and mold technology, which is applied in the field of tee mold manufacturing, can solve the problems of reducing the overall competitiveness of the enterprise, increasing the burden of the enterprise, and re-opening the mold, so as to improve the overall stability, compact the overall structure of the mold, and prolong the service life Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] 1. Get 200 parts of alumina by weight, 0.2 part of lithium, 0.8 part of beryllium, 18 parts of magnesium oxide, 6 parts of copper sulfate, 30 parts of china stone sand, 10 parts of cobalt soil ore, 0.3 part of dehydrated zinc chloride;
[0016] ②Put the raw materials into a ball mill for pulverization and grinding, the obtained powder is fully mixed, and then the mixed powder raw materials are formed into a blank with a regular shape;
[0017] ③Pre-sinter the obtained blank, the sintering temperature is controlled at 1100°C, the time is controlled at 15 minutes, and then it is taken out and naturally cooled to room temperature;
[0018] ④ Carry out blank processing on the blank, so that the size of the initial mold after the blank is slightly larger than the final mold size;
[0019] ⑤ Carry out high-temperature sintering treatment on the mold after the car billet is completed. First, raise the furnace temperature to 1900°C at a rate of 50°C / min and keep it for 15 minut...
Embodiment 2
[0022] 1. Get 230 parts of alumina by weight, 0.5 part of lithium, 1.2 part of beryllium, 24 parts of magnesium oxide, 10 parts of copper sulfate, 35 parts of china stone sand, 15 parts of cobalt soil ore, 0.5 part of dehydrated zinc chloride;
[0023] ②Put the raw materials into a ball mill for pulverization and grinding, the obtained powder is fully mixed, and then the mixed powder raw materials are formed into a blank with a regular shape;
[0024] ③Pre-sinter the obtained blank, the sintering temperature is controlled at 1300°C, the time is controlled at 30 minutes, and then it is taken out and naturally cooled to room temperature;
[0025] ④ Carry out blank processing on the blank, so that the size of the initial mold after the blank is slightly larger than the final mold size;
[0026] ⑤ Carry out high-temperature sintering treatment on the mold after the car billet is completed. First, the furnace temperature is raised to 1900°C at a rate of 50°C / min and kept for 20 min...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 