Temporary accurate positioning device and positioning method for steel box girder hoisting

A technology for precise positioning and steel box girders, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as low efficiency, waste of materials and manpower, and unfavorable welding operations of girth seams, so as to save manpower and improve accuracy The effect of sex and simple structure

Active Publication Date: 2019-02-01
GEZHOUBA GRP NO 2 ENG
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In order to ensure the construction quality and construction progress of the steel box girder, the steel box girder needs a fast and accurate temporary positioning device to connect the steel box girder together quickly, firmly and accurately before the hoisting is completed and the ring seam is spliced. ;The conventional temporary positioning method generally adopts the temporary welding and clamping of small U-shaped steel plate code plates on the steel box girders on both sides, and then cuts off the code plates after the circular seam splicing is completed. The code plates must be 10~20cm each Only when it can be fixed firmly, the code board is very dense and is not conducive to the welding operation of the circular seam, which wastes materials and manpower, and the efficiency is relatively low

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Temporary accurate positioning device and positioning method for steel box girder hoisting
  • Temporary accurate positioning device and positioning method for steel box girder hoisting
  • Temporary accurate positioning device and positioning method for steel box girder hoisting

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] see Figure 1 to Figure 5 , the temporary accurate positioning device for steel box girder hoisting of the present invention comprises two precision-rolled rebars 1, two through-hole jacks 2, and two positioning cards 3. Base plate 4 is arranged in each positioning card, the vertical plate 5 that is positioned at one end of the base plate and the base plate is integrated, symmetrically placed on the base plate and one end is connected respectively on the vertical plate and two ribs 6 that form grooves between the vertical plate and the base plate. The notches on the two positioning cards are opposite and there is a width between the end faces of the notches to meet the bottom block 7 of the steel box girder 13 seam width stretching out from the positioning card. The two vertical plates respectively have an upper alignment hole 8 and a lower alignment hole 9 along the vertical direction of the center. There are adjusting locking nuts 10 corresponding to the upper and lo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a temporary accurate locating device for hoisting of a steel box girder. The device comprises two finish-rolled thread steels, two center hole jacks and two locating clamps, wherein a bottom plate, a vertical plate, which is integrated with one end of the corresponding bottom plate, and two ribbed plates, which are symmetrically arranged on the corresponding bottom plate and form grooves with the corresponding vertical plate and the corresponding bottom plate are arranged in each locating clamp, one end of each ribbed plate is connected with the corresponding vertical plate, notches of the two locating clamps are opposite, packing blocks, of which the width can meet that of joints of the steel box girder and lower parts extend out of the locating clamps, are arranged between end faces of the notches, upper alignment holes and lower alignment holes are separately formed in the two vertical plates along central vertical directions, adjusting lock nuts corresponding to the upper and lower alignment holes are separately arranged at outer sides of the two vertical plates, and one end of each finish-rolled thread steel separately penetrates through the corresponding adjusting lock nuts, the upper and lower alignment holes of the corresponding locating clamp and a center hole of the corresponding center hole jack and then is connected with an end nut. The device provided by the invention is simple in structure, low in cost and high in operability, so that the accuracy of temporary locating of the steel box girder is greatly improved. The invention further provides a temporary accurate locating method for the hoisting of the steel box girder.

Description

Technical field: [0001] The invention relates to a temporary precise positioning device and a positioning method for hoisting a steel box girder. Background technique: [0002] At present, in order to reduce the self-weight of the bridge and increase the bearing capacity of the bridge while increasing the span as much as possible, the main girder of the suspension bridge generally adopts a steel plate box girder structure. Steel box girders generally need to be hoisted and assembled at the bridge construction site. The positioning accuracy of the steel box girder is very high, including hoisting, assembling and finally installing in place. In order to ensure the construction quality and construction progress of the steel box girder, a fast and accurate temporary positioning device is needed during the hoisting process of the steel box girder to connect the steel box girder together quickly, firmly and accurately before the hoisting is completed and the ring seam is spliced....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 李俊陈勇陈松欧兵柴菊红