Assembly construction method for large-cross-section prefabricated structure in deep and large foundation pit in soft soil area
A technology of prefabricated structures and construction methods, which is applied in basic structure engineering, excavation, construction, etc., can solve problems such as transportation difficulties, large-scale prefabricated components with large sections, and difficult assembly of large-section prefabricated structures, so as to reduce the cost of urban traffic effect of influence
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] like figure 1Shown, a specific embodiment of the present invention, a kind of assembly construction method of large-section prefabricated structure in deep and large foundation pit in soft soil area, such as figure 1 As shown, there is an internal support system in the deep and large foundation pit in the soft soil area. The internal support system includes three sections of horizontal support, namely the first horizontal support 1, the second horizontal support 2 and the third horizontal support 3, and two vertical columns Support 4, the two side walls of the deep and large foundation pit are also provided with enclosure structures 5, and in this embodiment, the prefabricated structure 8 will be assembled and installed in the deep and large foundation pit.
[0043] Firstly, a block design should be carried out according to the overall prefabricated structure 8 to form a block design scheme. Prefabricated structures 8 such as figure 2 , 3 shown. The height of the p...
Embodiment 2
[0056] In this embodiment, the layout of the support system in the deep foundation pit is the same as that in Embodiment 1. figure 1 As shown, but the height of the prefabricated structure 13 in this embodiment is higher than that of the prefabricated structure 8 in Embodiment 1, and the overall height of the prefabricated structure 13 is slightly lower than the height of the first lateral support 1 . Therefore, the horizontal supports that the prefabricated structure 13 may encounter when moving longitudinally in the deep and large foundation pit are the third horizontal support 3 and the second horizontal support 2, so the prefabricated structure 13 needs to determine two prefabricated structure horizontal dividing lines 83, two horizontal The height of the dividing line 83 is slightly lower than the height of the second transverse support 2 and the third transverse support 3 respectively, and divides the prefabricated structure 13 into the bottom prefabricated structure laye...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com