Construction Method of Secondary Reinforcement at the Exit Hole of Pipe Jacking
A construction method and pipe jacking technology, which is applied in drilling pipe, casing, earthwork drilling and mining, etc., can solve problems such as damage, and achieve the effect of increasing stability and good reinforcement effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The safety helmet with monitoring function and its monitoring method provided by the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer with reference to the following description and claims. It should be noted that all the drawings are in a very simplified form and use imprecise scales, and are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention.
[0033] see figure 1 , figure 1 A flow chart of the construction method for the secondary reinforcement of the exit hole of the jacking pipe provided in this embodiment. As an example, the original reinforcement measures at the exit of the pipe jacking are as follows: figure 2 , image 3 As shown, the jacking well 100 includes a well wall 110 and a bottom cover 120. On the well wall 110, an embedded casing 130 ...