Automatic staffing method and system

An automatic and team technology, applied in the Internet field, can solve the problems of poor scheduling fairness and low scheduling efficiency, and achieve the effect of improving the fairness of scheduling and improving the utilization rate of manpower

Inactive Publication Date: 2017-08-18
携程旅游信息技术(上海)有限公司
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The technical problem to be solved by the present invention is to provide an automatic scheduling method and system in order to overcome the shortcomings of low scheduling efficiency and poor scheduling fairness caused by manual scheduling in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Automatic staffing method and system
  • Automatic staffing method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The present invention is further illustrated below by means of examples, but the present invention is not limited to the scope of the examples.

[0023] Such as figure 1 As shown, an automatic shift scheduling method includes the following steps:

[0024] Step 101 , obtain the estimated total manpower required per day according to the actual workload.

[0025] Step 102, adjust the first working time parameters of all shifts to obtain the actual total manpower per day, and iterate the actual total manpower, so that the actual total manpower curve and the estimated total manpower curve have the highest fitting degree; the first working time parameter includes overtime working time and rest time. Among them, the estimated total manpower per day can be the estimated total manpower between 6:00 and 6:00 of the next day. The purpose is to globally adjust the overtime time or rest time of each team to ensure The fairness of overtime or rest for the team. Step 102 also incl...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present invention discloses an automatic shift scheduling method and system. The automatic shift scheduling method includes the following steps: S1. Obtaining the estimated total manpower required per day according to the actual workload; S2. Adjusting the first working hours of all shifts and groups parameters to obtain the actual total manpower per day, and iterate the actual total manpower so that the actual total manpower curve has the highest fitting degree with the estimated total manpower curve; the first working hours parameter includes overtime time and breaks. The automatic shift scheduling method and system of the present invention can improve the manpower utilization rate and the fairness of shift scheduling through automatic shift scheduling.

Description

technical field [0001] The invention relates to the technical field of the Internet, in particular to an automatic scheduling method and system. Background technique [0002] Scheduling is an important means of rationally arranging work manpower, and it is widely used in all enterprises. Scheduling is mainly based on the company's actual business development needs, and reasonably arranges the manpower to work in each time period to ensure that the company's business needs are met without causing waste of human resources. In general enterprises, most managers or special schedulers carry out manual scheduling. This working method has natural defects: 1) It is difficult to quantify and compare the scheduling results, and the comprehensive quality of the scheduling personnel in terms of experience, skills, adaptability, etc. will affect the scheduling results. 2) The efficiency of shift scheduling is low and time-consuming, which puts forward higher requirements on the work pr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
CPCG06Q10/06311G06Q10/06315
Inventor 邱志勇范红霞顾春峰刘以初
Owner 携程旅游信息技术(上海)有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products