[0031] Attached below figure 1 A preferred embodiment of the present invention will be described in detail.
[0032] Taking a 37-segment steel girder bridge mid-span steel girder closure construction as an example, the mid-span length of the cable-stayed bridge is 430m, and the closing section steel girder length is 2.58m. In the invention, the double-sided steel beams are simultaneously closed for construction, and the counterweight method is used to eliminate the torsion caused by the simultaneous lifting of the steel beams, thereby realizing the construction of the middle-span steel beams of the cable-stayed bridge, improving the precision of the closing, and reducing the closing of the middle-span steel beams The construction time reduces the risk. The specific measures are as follows:
[0033] (1) Closing Dragon Principle
[0034] The erection sequence of steel beams in the closure section is longitudinal beams-cross beams-small longitudinal beams-brackets, and a closed and s...