Paving grab bucket having function of sieving, for tunnel bridge road construction
A road construction and functional technology, which is applied in the field of grabs, can solve the problems of easy attachment, no screening or multi-stage screening of grabs, and shortened service life of grabs, so as to achieve diversified functions, save energy, and improve work efficiency. efficiency effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific illustrations.
[0019] like Figure 1 to Figure 5 As shown, a paving grab bucket for tunnel, bridge and road construction with screening function, including electric telescopic rod 3, first grab flap 8, second grab flap 11 and mounting seat 18, at the central position of the top of mounting seat 18 Installation joint 19 is installed, and the two ends of installation joint 19 are all provided with threaded interface, is convenient to the installation of grab bucket, and the outside of mounting base 18 upper end is equipped with fixed installation plate 1, is evenly provided with installation limit hole 24 on the fixed installation plate 1 , so that the grab is more stably installed on the mechanical arm, the bottom of the mounting base 18 is evenly equipped with...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


