The construction method of double-machine hoisting combined with roller bearing installation of oblique parallel chord truss truss

A technology of truss and roller shafts, which is applied in the construction method field of double-machine lifting combined with roller shaft support installation of inclined parallel chord trusses, which can solve problems such as difficult balance and achieve the effect of ensuring the truss structure

Active Publication Date: 2018-12-25
山西太行建设开发有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The invention provides a construction method for the entire truss of an oblique parallel chord truss to be hoisted by double machines combined with the installation of roller bearings, which solves the difficult problem of balance when the oblique parallel chord truss is hoisted by two machines as a whole. At the same time, the roller bearings are disassembled and installed. Release the horizontal thrust transmitted from the truss to the support to ensure the safety of the truss structure

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0014] The whole truss with oblique parallel chord truss is hoisted by double machines combined with the installation of roller bearings, including on-site assembly of steel trusses, axis of support column tops, re-measurement of elevation, installation of roller bearings, hoisting and fixing of steel trusses, and measurement correction.

[0015] The on-site assembly of the steel truss includes the following steps: the steel truss is processed into semi-finished products in the processing plant, each truss is divided into several units and transported to the installation site for assembly, the lower chord H-beam of a truss is assembled on the installation platform, aligned and leveled, inspected After the size is correct, carry out welding and fixing; install the side steel truss and the upper and lower chord members to connect the single truss into a whole; place the two temporary supports on the concrete ground, level and align, and hang the assembled and welded single truss ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a hoisting method of an oblique parallel chord member truss, in particular to an installation and construction method of lifting the whole oblique parallel chord member truss with two cranes combining a roll shaft support. According to the method, a two-crane and four-point hoisting way with large-tonnage and small-tonnage cranes is adopted for hoisting the whole truss. By reasonably distributing the equipment hoisting weight on the two cranes, the weights born by the two cranes are within permissible hoisting performance ranges respectively, and accordingly the truss hoisting operation is completed. When the truss is fixed to the roll shaft support, a disintegrating installation method is adopted to the roll shaft support. Before the truss is hoisted, firstly, the roll shaft support is placed at the top of a support pillar to be in keep with the axis of the top of the support pillar. After the support of the upper portion of the truss is hoisted on a top plate of the roll shaft support, the positions of the roll shaft support and the whole truss are checked again, if there is no error, a pre-buried piece, at the top of the support pillar, of a bottom plate of the roll shaft support is welded and fixed, and then the top plate of the roll shaft support and the support at the upper portion of the truss are welded and fixed. It is ensured that the horizontal force transmitted to the support from the truss structure can be released after the truss and the roll shaft support are fixed.

Description

technical field [0001] The invention relates to a production and installation method of an oblique parallel chord truss using roller shafts, in particular to a construction method for the entire truss of an oblique parallel chord truss to be lifted and hoisted by two machines combined with installation of a roller shaft support. Background technique [0002] In coal mining enterprises and large chemical enterprises, the coal transportation trestle of the ground production system plays an important role as the load-bearing structure of the transportation system, and the coal transportation trestle mostly adopts the structural form of oblique parallel chord truss. Due to the large height difference between the upper and lower fulcrums of the large-scale coal transportation inclined trestle, and the hoisting weight of the single truss is large and the installation height is high, it is difficult to control the overall balance of the truss during the hoisting of the trestle truss...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 李若辉王永星郭磊张慧男刘永胜王惠荣蔡涛胡荣丽王建国
Owner 山西太行建设开发有限公司