Wind-power grid-connected system risk assessment method based on wind speed time period feature

A technology of time period and risk assessment, applied in wind power generation, information technology support systems, electrical components, etc., can solve problems such as system risk misjudgment, no reserve power generation capacity, insufficient power supply, etc., to improve reliability, The effect of controlling the risk of power grid operation

Active Publication Date: 2017-11-24
ECONOMIC RES INST OF STATE GRID GANSU ELECTRIC POWER +3
View PDF0 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Therefore, the traditional system risk assessment method using Weibull distribution to generate wind speed samples cannot fully reflect the actual situation, and may cause system operators to misjudge the system risk, such as underestimating the system reliability in the month with high wind speed. Maintenance will lead to a large number of curtailed wind; overestimating the reliability of the system in months with low wind speeds, not reserving enough backup power generation capacity, resulting in insufficient power supply and resulting in power outages

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Wind-power grid-connected system risk assessment method based on wind speed time period feature
  • Wind-power grid-connected system risk assessment method based on wind speed time period feature
  • Wind-power grid-connected system risk assessment method based on wind speed time period feature

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0049] The preferred embodiments of the present invention will be described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described here are only used to illustrate and explain the present invention, and are not intended to limit the present invention.

[0050] Such as figure 1 Shown, the present invention comprises the following steps:

[0051] A. Based on the daily average wind speed and wind farm production data of large-scale wind farms in selected areas, the time period characteristics of wind speed are divided into two parts. One part selects an appropriate time period fitting function f(t) to reflect the long-term wind speed , gentle change trend; the other part uses a random variable δ(v) that obeys a certain probability distribution to reflect the short-term and rapid fluctuation characteristics of wind speed; the time period distribution model F(t) of wind speed is obtained by superimposing the two parts, an...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a wind-power grid-connected system risk assessment method based on the wind speed time period feature. The method comprises the following steps: processing the traditional annual wind speed probability distribution as the time-varying distribution function with time-dependent wind speed, reflecting the main change rule of the wind speed by using a time period fitting function, and reflecting the fluctuant feature of the wind speed by using the random variable obeying some probability distribution, wherein the time period fitting function and the wind speed random variable are overlapped to obtain a time period feature model of the wind speed; computing the time-varying capacity of a wind power plant through a function relation between the time-varying wind speed and the wind generation set, and assessing the time-varying risk index of the wind-power grid-connected system by using the Monte Carlo sampling method. By using the method disclosed by the invention, the time-dependent system risk index can be computed, and the auxiliary information can be provided for the power grid planning and designing, the system scheduling and operation-maintenance decision-making; and the method is in favor of managing and controlling the power grid running risk, and improving the reliability level for the power system running.

Description

technical field [0001] The invention relates to the technical field of risk assessment of power generation and transmission systems, in particular to a risk assessment method for wind power grid-connected systems based on wind speed time period characteristics. Background technique [0002] Since my country promulgated the "Renewable Energy Development and Utilization Promotion Law" in 2005, wind energy and other renewable energy sources have begun to develop rapidly with the support of national policies. In recent years, more and more large-scale wind farms have been connected to the power grid. However, due to the random and intermittent characteristics of wind power generation itself, it has a greater impact on the reliability of power system operation. [0003] Since the development of wind power, many scholars have conducted research on the risk assessment of power systems under the integration of large-scale wind power. To establish a reliability model of a wind farm,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/38G06Q10/06G06Q50/06
CPCG06Q10/0635G06Q50/06H02J3/386H02J2203/20Y02E10/76Y04S10/50
Inventor 万小花熊小伏付兵彬魏勇王建李浩然雒亿平梁魁孙志宏
Owner ECONOMIC RES INST OF STATE GRID GANSU ELECTRIC POWER