A Method for Stability Evaluation of Interbedded Rock Partition Wall in Highway Tunnel

A technology for road tunnels and evaluation methods, which is applied to instruments, measuring devices, and the use of sound waves/ultrasonic waves/infrasonic waves to analyze solids, etc., can solve the problem of quantitative and accurate description of the stress state of interlayer rock partition walls, which cannot meet the requirements of interlayer rock partition walls. Rapid evaluation of the stability of the wall, affecting the structural integrity of the interlayer rock partition wall, etc., to achieve the effects of cost control, safety assurance, and convenient installation

Active Publication Date: 2020-05-19
BEIJING MUNICIPAL CONSTR +2
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The traditional rock partition wall monitoring methods in the tunnel, such as borehole TV detection and ultrasonic damage detection in the tunnel, the built-in sensor arrangement, based on the information obtained by these sensors when evaluating the structure of the rock partition wall , will inevitably affect the integrity of the interlayer rock partition wall structure to a certain extent
[0004] Moreover, the traditional evaluation method of the interlayer rock partition is mainly formulated for the bias and deformation of the interlayer rock partition, and it is difficult to quantitatively and accurately describe the stress state of the interlayer rock partition under uneven compression
[0005] In addition, traditional monitoring and evaluation methods require a large amount of historical experience data and monitoring data for long-term analysis, and the theoretical model for analysis is insufficient, which cannot meet the needs of rapid evaluation of the stability of interlayer rock partition walls

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Method for Stability Evaluation of Interbedded Rock Partition Wall in Highway Tunnel
  • A Method for Stability Evaluation of Interbedded Rock Partition Wall in Highway Tunnel
  • A Method for Stability Evaluation of Interbedded Rock Partition Wall in Highway Tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0033] Embodiment 1 of the present invention provides a method for evaluating the stability of a rock-interbedded partition wall in a highway tunnel. Sensors are arranged in a matrix manner, and a double-difference imaging positioning method is added at the same time, which improves the monitoring accuracy and can reach the minimum scale of crack rupture. The wave velocity inversion imaging method is added, which can quantitatively describe the stress change process of the middle rock partition wall, and can analyze the bad structural plane of the middle rock partition wall. Through the description of the evolution of fracture microseismic events and the inversion of wave velocity inside the rock mass, the stability evaluation of interlayer rock partition walls is realized and quantitative results are given. According to the analysis and evaluation results, suggestions can be provided for the design and construction of interbedded rock partition walls in tunnels. Its implement...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a highway tunnel middle sandwich rock partition wall stability evaluating method. According to the method, sensors distributed at two sides of a tunnel middle sandwich rock partition wall in a matrix form are used for performing micro-seismic monitoring; seismic wave information of a rock breaking seismic source and an auxiliary seismic source is separated out from the micro-seismic monitoring result; the crack position is primarily positioned according to the micro-seismic wave information on the basis of the position of micro-seismic waves generated in the rock breaking seismic source; the crack position is further and precisely positioned according to a wave velocity model after the optimization of seismic wave information of the auxiliary seismic source by a double-difference imaging positioning method; a micro-seismic event group generated by the crack in the set space at the set time is selected for performing clustering analysis to obtain the spatial and temporal distribution characteristics and the destructive evolution characteristics of the micro-seismic event; the quantitative description on the rock body rupture degree is performed on the basis of the characteristics; the evolution process of the rock body rupture degree is deduced; further, the stability of the middle sandwich rock partition wall is evaluated. The method has the advantages that the stability of the middle sandwich rock partition wall can be fast evaluated; the tunnel construction safety and the later-period normal operation are ensured.

Description

technical field [0001] The invention relates to the technical field of civil engineering construction, in particular to a method for evaluating the stability of interbedded rock partition walls in highway tunnels. Background technique [0002] With the rapid development of expressways in mountainous areas of our country, tunnels have become an important element of expressways. Small clear distance tunnel is a common type of tunnel, but there are certain safety risks during construction, due to factors such as construction sequence, stress distribution and internal structure, the displacement, deformation and cracking of interlayer rock partition walls. For the interlayer rock partition wall of the highway tunnel with small clear distance, it bears changing loads during the construction of the tunnel, and in the later operation of the tunnel, some damage and deterioration will occur inside the interlayer rock partition wall as time goes by. Therefore, monitoring the interlay...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G01N29/04
CPCG01N29/048G01N2291/0232
Inventor 吴进科姚海波孔恒孙强张鹏周阳文言靳利军马少军高飞高明生程立华尹留阳单中趁汪凉吴江张全贺黄振龙刘羽王雄付贵庆高万夫王鹏陈斌陈伟汤明崔宇声王彬张冰崔少光郭飞
Owner BEIJING MUNICIPAL CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products