Construction pile foundation
A technology for construction piles and pile foundations, which is applied in construction, sheet pile walls, foundation structure engineering, etc., can solve problems such as the need to improve the seismic performance and safety performance, reduce the shock absorption effect, and it is difficult to meet the national seismic requirements, and achieve the welding effect Good, easy welding operation, improved shock absorption effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] Such as Figure 1-6As shown, a construction pile foundation includes an upper pile base body 1, a lower pile base body 2 and a damping device matched with the upper and lower pile base bodies; specifically, the damping device includes a sealing seat 3 And the shock-absorbing bearing 4 between the upper and lower pile bases; the bottom of the sealing seat 3 is connected with the lower pile base 2, and the upper part of the sealing seat 3 is connected with the upper pile base 1 There is a sealing structure between them; the sealing seat 3 includes a first seat body 31 and a second seat body 32 welded to each other, specifically, the first seat body 31 includes an upper connecting plate 311, a lower connecting plate 312 and a set In the middle plate 313 between the upper and lower connecting plates, the upper part of the middle plate 313 is welded and fixedly connected with the upper connecting plate 311, and the lower part of the middle plate 313 is welded and fixedly con...
Embodiment 2
[0035] The difference between this embodiment and embodiment 1 is: as Figure 7-10 As shown, the sealing member 5 includes an annular sealing groove 54, an upper pressing part 55 and a lower pressing part 56 arranged on the upper pile base, and the upper pressing part 55 and the lower pressing part 56 pass through The concrete is poured and formed on the base of the upper pile, the upper compacting part 55 and the lower compacting part 56 are both arranged in an annular structure, and the annular sealing groove 54 is arranged between the upper and lower compacting parts; , the upper connecting plate can penetrate into the annular sealing groove 54; further, the lower surface of the upper pressing part 55 is provided with a first leak-proof layer 551, and the upper surface of the lower pressing part 56 is provided with The second anti-leakage layer 561, the third anti-leakage layer 541 is arranged in the annular sealing groove 54; the first anti-leakage layer 551, the second an...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


