New energy grid-connected power system multi-time scale scheduling method based on robust optimization

A multi-time scale, power system technology, applied in the direction of AC network circuits, resources, electrical components, etc., can solve the problems of not considering the uncertainty of new energy forecast values, frequent adjustment of scheduling plans, etc., to achieve economic and safety. , to achieve the effect of safety and economy, alleviating the pressure of scheduling

Active Publication Date: 2018-05-29
ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD +1
View PDF7 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] In view of the deficiencies of the above-mentioned prior art, the present invention provides a multi-time-scale scheduling method for new energy grid-connected power systems based on robust optimization, which solves the problem that the multi-time-scale scheduling in the prior art does not consider the uncertainty of new energy forecast values It can effectively reduce the impact of uncertain factors on the scheduling plan of the new energy grid-connected power system, which has good robustness and achieves a balance between safety and economy.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • New energy grid-connected power system multi-time scale scheduling method based on robust optimization
  • New energy grid-connected power system multi-time scale scheduling method based on robust optimization
  • New energy grid-connected power system multi-time scale scheduling method based on robust optimization

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] A multi-time scale scheduling method for a new energy grid-connected power system based on robust optimization, the new energy grid-connected power system includes new energy and dispatchable energy, including the following steps:

[0041] Step 1: Taking the dispatchable energy output in the new energy grid-connected power system as the decision variable, respectively establish the objective functions of dispatching plans for each time scale;

[0042]Step 2: Establish constraints including robust constraints and traditional physical constraints for each time-scale scheduling plan; among them, robust constraints are established based on uncertainty factors and robust level values, and uncertainty factors include new energy output and load ;

[0043] Step 3: Establish a robust optimal scheduling model for each time scale according to each objective function and corresponding constraints;

[0044] Step 4: According to the robust level value adjustment rules, select the ro...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a new energy grid-connected power system multi-time scale scheduling method based on robust optimization. A new energy grid-connected power system includes new energy and schedulable energy, and target functions of time scale scheduling plans are built respectively by using schedulable energy output as decision variables; the constraint condition, including robust constraints and traditional physical constraints, of each target function are formed respectively; according to each target function and the corresponding constraint condition, a robust optimization scheduling model of each time scale is established; according to a robust level adjustment rule, the robust level value of each time scale is selected and input in the robust optimization scheduling model of each time scale, so that the decision variables meeting the requirements of the target functions under the constraint conditions are obtained; according to the decision variables, a scheduling plan isadjusted, and thus scheduling of schedulable energy is conducted. The method can effectively reduce the influence of uncertain factors on the scheduling plan, has good robustness, and is both safe andeconomical.

Description

technical field [0001] The invention relates to the technical field of scheduling of new energy grid-connected power systems, in particular to a multi-time-scale scheduling method based on robust optimization. Background technique [0002] With the increasing environmental problems and energy depletion problems, renewable energy such as wind energy and solar energy has been greatly developed, and the proportion of energy has increased significantly. However, due to the uncertainty of wind power and photovoltaics, large-scale new energy grid integration has brought great challenges to the economic dispatch of power systems. [0003] Some existing studies improve the power grid's ability to deal with uncertain factors through the coordination of multi-time scale dispatching plans. However, the current methods directly use the predicted values ​​of new energy sources and loads when formulating multi-time scale scheduling plans, and do not take into account the uncertainty of t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06H02J3/38H02J3/46
CPCG06Q10/04G06Q10/06312G06Q50/06H02J3/003H02J3/382H02J3/46H02J2203/20
Inventor 朱继忠熊小伏禤培正欧阳金鑫刘乔波谢平平邹金
Owner ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD