Unlock instant, AI-driven research and patent intelligence for your innovation.

Power construction process management optimization method and system

A technology for power construction and process management, applied in office automation, data processing applications, instruments, etc., can solve problems such as massive labor input, stagnation, and difficulties in power construction process management

Active Publication Date: 2020-11-03
GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, in the current power construction projects, the management of the construction site is still stagnant, requiring a large amount of human labor input, and entering each construction site for process management. The management of the power construction process is difficult and the control efficiency is low.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power construction process management optimization method and system
  • Power construction process management optimization method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] In order to make the objectives, technical solutions and advantages of the present application more clearly understood, the present application will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application, and do not limit the protection scope of the present application.

[0040] In the current power construction projects, the management of the construction site requires a lot of human labor input, and entering each construction site for process management, the power construction process management is difficult, and the control efficiency is low. The current construction site management method has the following problems: First, the informatization degree of project management is not high, the scope of project informatization is narrow, and the sharing and transmission efficiency of project-related information is...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an electric power construction process management optimization method and system, a readable storage medium and computer equipment. The method comprises the steps that when itis detected that the electric power construction starts, uploaded construction site data are received; a dispatching message is issued according to the site video data and used for controlling the construction site operation; the construction site is subjected to index analysis according to the check item data, and a check item correction scheme is issued according to the index analysis result; uploaded dispatched site video data and corrected check item data are received, and the construction state message of the electric power construction is updated according to the dispatched site video data and the corrected check item data. According to the scheme of the electric power construction process management optimization method and system, the construction site data are received, the construction site condition is grasped in real time, the dispatching controlling and check item problem rectification are performed through issuing the dispatching message and the check item correction scheme, the management process is convenient to implement, remote dispatching management can be realized, and the controlling efficiency of the electric power construction process is high.

Description

technical field [0001] The present application relates to the technical field of power system construction, and in particular, to a power construction process management optimization method, system, computer-readable storage medium, and computer equipment. Background technique [0002] With the continuous increase of the state's investment in urban power construction, the number of simultaneous construction projects will be much more than in the past for a long period of time in the future. How to strengthen the quality management of urban power grid construction, continue to carry out project quality improvement activities, and promote The transformation of project construction to the direction of standardization and the creation of high-quality, safe, high-quality and environmentally friendly projects have become new opportunities and challenges for the power construction industry. At present, urban power construction has basically realized the informatization of business ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/06
CPCG06Q10/0631G06Q10/06395G06Q10/103G06Q50/06
Inventor 林克全孙思光杨荣霞赵亮王嘉延马志刚
Owner GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD