Cross-river tunnel engineering construction simulation system based on BIM

A simulation system and tunnel engineering technology, applied in the field of electronic information, can solve problems such as the introduction of BIM technology into cross-river tunnels, and achieve the effect of increasing portability and reusability, and increasing work efficiency

Inactive Publication Date: 2018-07-10
SHANGHAI UNIV +2
View PDF1 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

According to the literature survey, BIM technology has not yet been introduced into the construction process of cross-river tunnels

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cross-river tunnel engineering construction simulation system based on BIM
  • Cross-river tunnel engineering construction simulation system based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0045] see figure 1 , the present invention discloses a BIM-based construction simulation system for cross-river tunnels. The construction management system includes: one or more WEB clients 1 and WEB servers 5 .

[0046] Both the WEB client 1 and the WEB server 5 are loaded with a BIM model system 2 , the WEB client also includes a progress tracking system 3 and a safety tracking system 4 , and the WEB server also includes a construction simulation analysis system 6 and a central database 7 . The aforementioned WEB client obtains construction process data in real time through the progress tracking system 3 and the safety tracking system 4, and interacts with the BIM model system 2 to realize comprehensive display and management of 3D simulation and visualized construction progress data.

[0047] The WEB server is connected to the WEB client to receive the multidimensional data in the construction process from the WEB client and store it in the central database 7; the WEB serv...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a cross-river tunnel engineering construction dynamic simulation system based on BIM. The method comprises the following steps of using a BIM platform; carrying out integrationexploration; designing an accomplishment; dynamically collecting progress information in real time; safely monitoring data; using a parameterization modeling technology to realize integration image presenting and dynamic simulation; dynamically presenting a construction progress image and synchronously presenting a safe monitoring state; based on the above steps, tracking an engineering progressand a quality safety condition; and based on the engineering progress, analyzing the influence of underground construction to the safe monitoring state. In the invention, the construction progress canbe dynamically and visually presented, construction and quality safety monitoring images in any periods can be reflected, dynamic process simulation based on a timeline is realized, a change rule between the safety monitoring and the construction progress is compared and analyzed, and engineering safety and stable state determination is assisted to make.

Description

technical field [0001] The invention belongs to the technical field of electronic information, and relates to a construction management system for a cross-river tunnel, in particular to a BIM-based construction simulation system for a cross-river tunnel project. Background technique [0002] Municipal engineering projects are composed of multiple stages such as planning, implementation, operation and maintenance. There are many participants, and the construction and operation and maintenance of the project take a long time. The amount of information generated in this process is undoubtedly very huge. Studies have shown that under the traditional working mode and the current technical level, the discontinuity or loss of project information is one of the important reasons for low production efficiency during the execution of engineering projects at different stages. Therefore, how to effectively use a large amount of project information and effectively communicate among partic...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06F17/50
CPCG06Q10/0633G06F30/13G06F30/20
Inventor 胡珉喻钢高新闻刘艳滨张湄熊诚滕丽段创峰巴雅吉呼孔祥平周丽孙向阳徐伟杜娟
Owner SHANGHAI UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products