Adjustment Method of Cable Internal Force of Bridge with Continuous Deck Structure
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- WUHAN UNIV OF TECH
- Publication Date
- 2020-08-25
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the field of bridge construction and detection, and in particular relates to a method for adjusting the internal force of a bridge cable with a continuous bridge deck structure.
[0002] technical background
[0003] With the rapid development of the national economy, the country's investment in transportation infrastructure is also increasing. The proportion of bridge construction in the railway network and road network is getting higher and higher. Bridges cross rivers, canyons, existing traffic lines and other various fields. When building a specific type of building, it is necessary to adopt a long-span cable system bridge of hundreds of meters or even thousands of meters. For structures such as cable-stayed bridges, suspension bridges or arch bridges, which have both cable-bearing members and continuous decks, in order to ensure that the bridge alignment and internal forces achieve a more ideal design state, the reasonable ...