Optimization dispatching method of wind power plant containing distributed power flow controller
A power flow controller and optimal scheduling technology, applied in wind power generation, AC network circuits, electrical components, etc., can solve problems such as increasing system operating costs and abandoning wind, and achieve the effect of improving model accuracy and improving economy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0049] The present invention will be further described below in conjunction with the accompanying drawings.
[0050] Such as figure 1 As shown, the present invention proposes an optimal dispatching method for wind farms with a distributed power flow controller (DPFC), aiming to provide an economical, safe and more accurate dispatching model for future power grid development, mainly including: based on pre-built Distributed power flow controller model and constraints, with the goal of minimizing power generation costs, formulate a day-ahead scheduling plan; carry out rolling corrections with a cycle of 1h, and consider short-term wind power forecast information in each rolling correction, based on the day-ahead scheduling plan , modify the power generation plan from the current time section to the next dispatching time in real time and the operation control strategy of DPFC; formulate a real-time dispatching plan with the lowest power generation cost in a single period as the o...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com