Mining method for one-time false bottom cemented filling after open-stope method
A mining method and cemented filling technology, which is applied to filling materials, ground mining, mining equipment, etc., can solve the problems of false bottom construction period, long maintenance time, and low mining efficiency, so as to improve recovery rate, ensure strength, and increase resources The effect of utilization
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] Gansu Jingtieshan Mining Co., Ltd. Huashugou Copper Mine 2760-2820 middle section has adopted the technical scheme of the present invention. The middle section of Huashugou Copper Mine has a thick ore body, and the thickness of the middle part of the ore body is greater than 30m. According to the actual production conditions, the Huashugou Copper Mine is divided into a middle section every 60m, a layer every 10m, and an ore outlet river is arranged every 10m at the bottom of the middle section to form an ore outlet structure. Construction process such as figure 1 As shown, the steps are as follows:
[0021] A. Layout of rock-drilling roadway in mine house: the ore blocks are divided according to the way that mine house and ore pillar are alternately arranged, and the middle section adopts vertical ore body to arrange mine house, and the width and height of rock-drilling roadway are both 3m;
[0022] B. False bottom laying of rock drilling roadway: Lay a 0.5m thick rei...