Outwards-inclining side wall horizontal bottom-building basin-shaped freezing water-stopping construction method for 8-pilot-tunnel PBA construction method
A horizontal and hydraulic technology, applied in the direction of infrastructure engineering, protection devices, sinking, etc., can solve the problems of low freezing efficiency, long construction period, and delayed work, so as to avoid excavation of frozen soil, save costs, and enhance anti-floating sexual effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
[0044]In describing the present invention, it is to be understood that the terms "central", "longitudinal", "transverse", "front", "rear", "left", "right", "vertical", "horizontal", The orientations or positional relationships indicated by "top", "bottom", "inner", "outer", etc. are based on the orientations or positional relationships shown in th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


