An installation method of settlement monitoring equipment under the condition of large height difference and high fill
A technology for settlement monitoring and installation methods, which can be used in roads, landfills, water conservancy, and foundation fields, and can solve problems such as danger and heavy workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0081] Embodiment 1: The difference from Comparative Example 1 is that the settling plate is improved.
[0082] The main feature of comparative examples 1, 2, and 3 is that the settlement plate does not need to be connected, which is an advantage for areas with low fill, but it is basically not suitable for areas with high fill, such as areas with a fill height greater than 6m.
[0083] Yet, because there is rope 3 inside pipe body, how to take over is a difficult problem.
[0084] Such as Figure 9 As shown, the nozzle of the upper pipe is provided with a rope fixing device 2-1, and the rope fixing device 2-1 is threadedly connected to the upper pipe;
[0085] Along with the increase of filling, set the slot on the upper part of the rope fixing device 2-1, then insert the upper standard connecting pipe in the slot, the upper standard connecting pipe is divided into two parts along the longitudinal direction, when installing , insert the bottom of the 2 parts of the upper up...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 