Optimal task scheduling method and system based on pseudo-tree structure in data center network
A data center network and task scheduling technology, applied in data exchange networks, digital transmission systems, transmission systems, etc., to achieve efficient computing, reduce computing overhead, and reduce computing processing overhead
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] see figure 1 In this embodiment, the implementation steps of the optimal task scheduling method based on the pseudo-tree structure under the data center network include:
[0040] 1) Input the information of the workload request WK and the infrastructure network SN, the information of the workload request WK includes virtual nodes, virtual links and their constraints, and the information of the infrastructure network SN includes physical nodes, physical links and its constraints;
[0041] 2) With the mapping cost as the target, the constrained optimization problem model COP is established according to the workload request WK and the infrastructure network SN;
[0042] 3) The virtual node in the workload request WK to build a pseudo tree;
[0043] 4) For the constrained optimization problem model COP, the leaf nodes of the pseudo-tree begin to report to the parent node the optimal partial solution through the cost message COST, and the parent node that receives the mess...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com