Construction method of caisson in underground space of muddy soil
Patent Information
- Authority / Receiving Office
- CN ยท China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- GEOTECHN TECH
- Publication Date
- 2021-01-19
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of construction, in particular to a caisson construction method in the underground space of muddy soil. Background technique
[0002] Ordinary caisson construction method, first make a caisson on the surface, and then under the enclosure of the well wall, continuously excavate soil from the well to make the caisson gradually sink under the action of its own weight, and then seal the bottom after reaching the predetermined design elevation , to build the internal structure. However, when the construction soil is relatively thick silt soil, the caisson mainly uses its own weight for subsidence construction, and appropriate control measures need to be taken to prevent problems such as sudden subsidence and offset. Construction in silt soil, adopting the undrained sinking method, the sinking speed of the caisson is difficult to control, and problems of sudden sinking and eccentricity are prone to occur. In add...