High-pressure jet grouting foundation construction technique
A technology of high-pressure spraying and construction technology, which is applied in the direction of infrastructure engineering, construction, sheet pile walls, etc., can solve the problem of low cutting efficiency and achieve the effect of improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] A high-pressure jet grouting foundation construction process, comprising the following steps:
[0032] (1) Drill holes at the corresponding pile positions, such as figure 1 As shown, use a drill rig 1 or a vibratory pile driver to drill holes until the depth of the pile hole 2 reaches the predetermined requirement;
[0033] (2) Insert the casing 3 with the cutting block 33 at the bottom into the pile hole 2 to the predetermined position, such as figure 2 As shown, the cutting block 33 is fixed on the outer wall of the bottom end of the casing 3, and extends radially outward, as Figure 4 As shown, one or more cutting blocks 33 can be provided, and as the number of cutting blocks 33 increases, the cutting effect during the rotation of casing 3 can be increased; there are multiple ways for casing 3 to be inserted into pile hole 2, One of them is to drive the sleeve pipe 3 with the cutting block 33 into the pile hole 2 by a vibrating pile driver. At this time, the cutti...
Embodiment 2
[0039] Compared with Embodiment 1, this embodiment adopts a different casing 3, in which the cutting block 33 can be retracted, and when inserting the casing 3 into the pile hole 2, it can be directly inserted into the pile hole without using other equipment 2 in.
[0040] Such as Figure 5 As shown, the casing 3 includes a tubular body 31 and a movable ring 32, and the movable ring 32 is rotationally connected to the tubular body 31. Specifically, the movable ring 32 is sleeved on the lower end of the tubular body 31, and the movable ring 32 is located at the bottom end of the tubular body 31. In order to realize the relative rotation between the movable ring 32 and the pipe body 31 . An anti-slip ring 34 is sleeved on the movable ring 32, and the anti-slip ring 34 can be made of rubber material. Through the elasticity of the rubber material, the process of inserting the sleeve pipe 3 into the pile hole 2 will not increase too much resistance.
[0041] Such as Figure 6 As...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com