An integrated rapid construction method for prefabricated bridges
A prefabricated assembly and construction method technology, applied in the erection/assembly of bridges, bridges, bridge construction, etc., can solve the problems of low integration degree and low bridge erection efficiency, achieve simple moving process, improve construction efficiency, and improve stability Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0052] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0053] Such as Figure 1-20 The bridge erecting machine of the embodiment includes a main truss 1, the main truss 1 is a truss structure arranged along the bridge direction, and the main truss 1 includes longitudinal beams arranged along the bridge direction and triangular trusses located on the lateral sides of the lower end of the longitudinal beams, two groups The triangular trusses are arranged at intervals along the transverse bridge, leaving gaps in the middle for the crane cables to pass through.
[0054] This embodiment is supported on the bridge deck that has been assembled by a plurality of fulcrums, including the front fulcrum located at the front half of the main truss 1 and the rear fulcrum of the rear half (the front of the present embodiment refers to Figure 11 in the right direction, the rear refers to Figure 11 In...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com