Project cost schedule management system
A technology for progress management and project cost, applied in data processing applications, instruments, office automation, etc., to achieve the effect of improving work quality and accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0031] refer to figure 1 , is an engineering cost progress management system disclosed in the present invention, including a cloud server 1, a management terminal 2, and a cost operator terminal 3, and each cost operator corresponds to a cost operator terminal 3.
[0032] The cloud server 1 includes a cost database module 110 , a timing module 120 , a reminder module 130 , a project information sending and receiving module 140 , a processing result sending and receiving module 150 , a project progress collection module 160 and a coster database 170 .
[0033] The management terminal 2 includes a project allocation module 210 , a processing receiving module 220 , a data updating module 230 and a project progress query module 240 .
[0034] The cost engineer terminal 3 includes a project information receiving module 310 , a processing result sending module 320...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com