Tunnel secondary lining arch crown back filling grouting process and grouting pipe
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- RANKEN RAILWAY CONSTR GROUP
- Publication Date
- 2019-05-03
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of tunnel engineering construction, in particular to a backfilling grouting process and a grouting pipe for the second lining of a tunnel. Background technique
[0002] With the development of transportation, especially the large-scale construction of rail transit, tunnel engineering has become one of the main projects of construction. When the secondary lining concrete of the tunnel is poured with a secondary formwork trolley, due to factors such as air pockets in the vault of the waterproof plate, insufficient concrete fluidity, and insufficient concrete pouring volume, voids will appear in the vault, which needs to be backfilled and grouted.
[0003] The backfill grouting process has made great progress from the traditional embedded galvanized steel pipe or PVC pipe to the current RPC pipe. However, during the backfill grouting process, there are always problems such as insufficient filling, or troubleso...