Tunnel secondary lining arch crown back filling grouting process and grouting pipe
A technology for grouting pipes and vaults, which is applied in the direction of tunnel lining, tunnels, pipes, etc., can solve the problems of troublesome positioning operation of grouting pipes, insufficient grouting, etc. solid effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Such as Figure 1-Figure 2 As shown, a backfill grouting process for the second lining vault of the tunnel, specifically includes the following steps:
[0042] Step 1: Open a grouting hole on the trolley top mold 1;
[0043] According to the length of the second lining trolley, holes are opened on the center line of the top mold 1 of the trolley, with a diameter of 40mm, and are evenly arranged from the lined end to the lined end. From the lined end to the lined end, the first grouting hole is set at a distance of 0.75m from the lined end 9, and then a grouting hole is set at an interval of 3.5m, and the last grouting hole is set at a distance of 0.75m from the lined end.
[0044] Step 2: welding a fixed flange at the grouting hole, and installing a positioning flange 10 on the fixed flange;
[0045] Weld the fixed flange at the opening position of the trolley top mold 1. The outer diameter of the fixed flange is 120mm and the inner diameter is 40mm. It is used to fix...
Embodiment 2
[0056] The difference between this embodiment and Embodiment 1 is that after the concrete 2 is finally set, the positioning flange, connecting sleeve, and grouting pipe fixing pipe are disassembled, and the formwork surface should be lowered below the RPC grouting pipe 7 to avoid walking Squeeze the RPC grouting pipe 7 during the trolley, and then backfill the grouting until the end die vent hole flows out of the thick slurry and stop the grouting. After the grouting is completed, the leaking part of the grouting pipe shall be cut and polished with an angle grinder.
Embodiment 3
[0058] Such as figure 2 As shown, a grouting pipe 7 is used for backfill grouting of the second lining vault of the tunnel. The top nozzle of the grouting pipe 7 is provided with a notch 70. When grouting into the grouting pipe 7, the grout will Flow along the notch 70 to the periphery of the grouting pipe 7 to fill the empty area 3, so that the filling is fuller.
[0059] The grouting pipe 7 is an RPC grouting pipe 7 .
[0060] The top nozzle of the grouting pipe 7 is provided with a cross groove, the width of the notch 70 of the cross groove is 1 / 15 to 1 / 5 of the outer diameter of the grouting pipe 7, and the depth of the notch 70 is the 1 / 10 to 1 / 5 of the outer diameter of the grouting pipe 7, too deep and too wide a notch 70 will affect the strength of the grouting pipe 7, and too small a notch 70 will affect the flow of the grout. The strength of the grouting pipe 7 can be guaranteed, and the grout can be guaranteed to flow out from the grouting pipe 7 quickly without ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Outer diameter | aaaaa | aaaaa |
| The inside diameter of | aaaaa | aaaaa |
| The inside diameter of | aaaaa | aaaaa |